Spotsylvania County
Route 1 Northbound and Southbound
Monday – Friday, 7 p.m.-10 a.m. Alternating single and double lane closures between I-95 southbound off-ramp and Southpoint Parkway. Single lane closures starting at 7 p.m. and double lane closures starting at 9 p.m.
Monday – Friday, 7 p.m.- 10 a.m. on Single lane closures between the I-95 southbound off-ramp and Southpoint Parkway.
Route 1 at Southpoint Parkway
Thursday – Friday, 10 p.m.- 6 a.m. Mobile operation with alternating lane closures to allow crews to conduct routine safety inspections of the traffic signal poles at the intersection.
Route 1 at Hodgins Road
Friday – Saturday, 10 p.m.- 6 a.m. Mobile operation with alternating lane closures to allow crews to conduct routine safety inspections of the traffic signal poles at intersection.
Route 1
Monday – Friday, 9 a.m.- 3 p.m. All travel lanes will remain open, but the alignment of the Route 1 travel lanes has shifted slightly between Arcadia Road and Mudd Tavern Road for road improvement work connected with the Kalahari Resorts & Conventions development. Permit work. Construction will also be underway along the road shoulder.
Route 3
Monday – Thursday, 6 a.m.-2 p.m. Single lane closures between Spotswood Furnace Road and Corter Avenue for permit work.
Route 17 Business
Thursday – Friday, 7 p.m.- 6 a.m. Mobile operation with alternating lane closures to allow crews to conduct routine safety inspections of the traffic signal poles at the Lee’s Hill Drive intersection.
Edenton Road
Tuesday – Thursday, 7 a.m. – 8 p.m. Pipe replacement near Dickerson Road. Road will close with a daily detour. Crews will reopen the road at the end of each shift to allow accessibility overnight.
Harrison Road
Monday – Friday, 9 a.m.- 3 p.m. Single lane closure between Kingswood Boulevard and Salem Church Road/Leavells Road with one-way, alternating traffic. Installation of water main under permit.
Harrison Road at Long Branch Drive
Tuesday – Thursday, 9 a.m.- 3:30 p.m. Guardrail repair. Flaggers will direct drivers through the work zone.
Locklear Landing Subdivision
Monday – Friday, 9 a.m.-6 p.m. Mobile lane closures for patching work ahead of upcoming road resurfacing on various routes in the Locklear Landing subdivision.
Millsgarden South Subdivision
Monday – Wednesday, 9 a.m.-8 p.m. Mobile lane closures for patching work ahead of upcoming road resurfacing on various routes in the Millsgarden South subdivision.
Southpoint Parkway
Monday – Friday, 7:30 p.m.-5:30 a.m., and Monday – Thursday, 9 a.m.-3:30 p.m. Single lane closures between Pacific Drive and Route 1.
Spotsylvania Parkway
Monday – Friday, 9 a.m.-3:30 p.m. Single lane closures between Deep Creek Drive/New Berne Road and Holley Oak Drive/Yellow Brinch Drive for signal work.
Summers Landing Subdivision
Monday –Tuesday, 9 a.m.-8 p.m. Mobile lane closures for road resurfacing on various routes in the Summers Landing subdivision. |