;

Area road work this week

by | Jun 24, 2024 | Ted Schubel, Traffic

I-95 Northbound and Southbound

Exit 118 (Thornburg) to Exit 130 (Route 3)

Monday – Thursday, 8 p.m. – 5 a.m. Alternating single lane closures for soil sampling work at mile markers 125-127.

Exit 136 (Centreport Parkway)

Sunday – Thursday, 9 p.m. – 5 a.m. Single lane closure at 9 p.m. followed by a double lane closure at 10 p.m. at mile marker 137, the bridge over Potomac Creek. Bridge joint repairs. Northbound lanes will reopen by 5 a.m.

Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)

Sunday – Thursday, 9 p.m. – 5 a.m. Single lane closure at 9 p.m. followed by a double lane closure at 10 p.m. at mile marker 145, the bridge over Aquia Creek. Bridge joint repairs. Northbound lanes will reopen by 5 a.m.

I-95 Northbound

Exit 133 (Falmouth/Warrenton) to Exit 136 (Centreport Parkway)

Monday – Friday, 9 p.m. – 4:30 a.m. Single lane closure starting at 9 p.m. on I-95 northbound at mile markers 133-135 for 95 Express Lanes Fredericksburg Extension construction.

I-95 Southbound

Exit 126 (Spotsylvania) to Exit 118 (Thornburg)

Sunday – Thursday, 9 p.m. – 5 a.m. Milling and paving between mile markers 125-120. Single lane closure at 9 p.m. followed by a double lane closure at 10 p.m. All lanes reopen by 5 a.m.

Bridge Washing

Sunday – Thursday, Single lane closure at 9 p.m. followed by double lane closure at 10 p.m. All lanes reopen by 5 a.m. Crews will be working along the following routes:

  • Route 1 at mile marker 126
  • Ni River at mile marker 121
  • Po River at mile marker 119
Caroline County

Guardrail Installation

Monday – Friday, 9 a.m. – 3:30 p.m. Single lane closure with flagging for guardrail installation at the following locations:

  • Route 17 (Tidewater Trail) southbound near Route 719
  • Route 207 (Bowling Green Bypass) eastbound near Route 301 overpass
  • Route 207 (Rogers Clark Boulevard) westbound near Route 622

Bridge Washing

Sunday – Thursday, 9 p.m. – 5 a.m. Bridge washing at multiple locations across Caroline. Lane closures and alternating one-way traffic at times directed by a flagging crew. Crews will be working along the following routes:

  • Route 207 over I-95
  • Route 601 over I-95
  • Route 605 over Mattaponi River
  • Route 632 over I-95
  • Route 639 over I-95
  • Route 652 over I-95
Essex County

Route 17

Monday – Friday, 7 a.m. – 7 p.m. Alternating lane closures on Route 17 between the Middlesex County and Essex County line and Eastern View Road for milling and paving.

Route 360

Sunday – Thursday, 7 p.m. – 6 a.m. Alternating lane closures on Route 360 eastbound and westbound between Middlesex/Essex County line and Route 652 (Eastern View Road). Bridge repair.

Surface Treatment

Monday – Friday, 7 a.m. – 7 p.m. Alternating lane closures with flagging operations for surface treatment on the following routes:

 

  • Route 635 (Elevon Road/Pilkington Road)
  • Route 637 (Occupacia Road)
  • Route 688 (Fortune Lane)
Gloucester County

Founders Mill Subdivision and Quail Hollow Subdivision

Monday – Friday, 7 a.m. – 7 p.m. Alternating lane closures for road resurfacing using cape seal surface treatment on various routes in the subdivisions. A pilot truck will be used to guide drivers through the work zone by alternating, one-way traffic on the various routes.

Lancaster County

Surface Treatment

Monday – Friday, 7 a.m. – 7 p.m. Alternating lane closures with flagging operations for surface treatment on the following routes:

  • Route 609 (Levelgreen Road)
  • Route 630 (Taylors Creek Road)
  • Route 634 (King Carter Drive & Piney Bend Drive)
  • Route 637 (James Wharf Road)
  • Route 659 (Crab Point Road)
  • Route 665 (Sullavans Road)
  • Route 672 (Virginia Road
  • Route 687 (Wilson Lane)
  • Route 694 (Peake Road)
  • Route 704 (Rose Drive)
  • Route 710 (Jenkins Drive)
  • Route 715 (Chesapeake Drive & Tavern Road)
  • Route 721 (Railway Road)
  • Route 727 (Lancaster Road)
  • Route 728 (Holly Haven Road)
  • Route 733 (Berkeley Forrest Road)
  • Route 739 (Jones Road)
  • Route 746 (Cedardale Lane)
  • Route 759 (Simmons Lane)
  • Route 766 (YoppsCove Road)
  • Route 768 (Chesapeake Drive)
  • Route 776 (Seafood Lane)
  • Route 786 (Dawson Lane)
  • Route 787 (Glebe Rd)
  • Route 791 (Moran Creek Road)
  • Route 801 (Jones Drive)
  • Route 802 (Faith Circle)
  • Route 1065 (Greenwood Court)
Middlesex County

Route 17

Friday, 7 a.m. – 7 p.m. Alternating lane closures on Route 606 (Briery Swamp Road) and the Essex County line. Milling and paving.

Northumberland County

Route 200 (Jessis Dupont Memorial Highway) Northbound

Monday – Friday, 9 a.m. – 3:30 p.m. Single lane closure for guardrail installation with flagging near Route 678.

Richmond County

Route 3 (History Land Highway)

Sunday – Tuesday, 8 p.m. – 5 a.m. Alternating lane closures for paving between Route 360 and West End Totuskey Creek Bridge.

Monday – Friday, 9 a.m. – 3:30 p.m. Single lane closure near Route 360 for guardrail installation.

Route 360

Sunday – Friday, 8 p.m. – 5 a.m. Alternating lane closures for milling and paving, and pavement markings between Gordon Lane and Downing Bridge.

Spotsylvania County

Route 1 Northbound and Southbound

Monday – Thursday, 8 p.m. – 5 a.m. Alternating single lane closures between Market Street and I-95 off-ramp for soil sampling work.

Route 1 Northbound

Monday – Friday, 7 p.m. – 7 a.m. Single lane closure for shoulder widening work between the I-95 southbound off-ramp and the I-95 overpass.

Route 3

Alternating temporary single lane closures for mobilization and sign installation for the Route 3 over Lick Run culvert installation project between the Spotsylvania County Museum and Montpelier Drive at the following times:

  • Westbound: Monday – Thursday, 12 p.m. – 5:30 a.m. and Friday – Saturday, 11 p.m. – 8 a.m.
  • Eastbound: Monday – Thursday, 12 p.m. – 5:30 a.m. and Friday – Saturday, 10 p.m. – 4 a.m.

Route 3 at Orange Plank Road

Sunday – Tuesday, 8 p.m. – 5 a.m. Alternating lane closures with police direction at the Route 3 and Orange Plank Road intersection for installation of a restricted crossing U-turn design.

Route 17 (Mills Drive)

Sunday – Thursday, 9 p.m. – 6 a.m. Alternating lane closures with one-way traffic at times directed by a flagging crew. Milling and paving between Route 1 and Old Dominion Parkway. Part of Route 17 widening and Route 17 I-95 overpass replacement project.

Route 606 (Mudd Tavern Road)

Sunday – Thursday, 9 p.m. – 5 a.m. and Friday, 12 a.m. – 5 a.m. Alternating lane closures with flagging for utility work between Route 1 and I-95.

Meadowlark Lane

Monday – Friday, 7 a.m. -4:30 p.m. Pipe replacement between Bob White Lane and Teal Court. Road will close daily and reopen by 4:30 p.m. Follow detour signs.

Morris Road

Sunday – Thursday, 8 p.m. – 6 a.m. Paving. One-way, alternating traffic directed by a flagging crew between Old Plank Road and Gordon Road. Installation of pavement markings following recent paving.

Southpoint Parkway

Monday – Thursday, 9:30 a.m. – 3:30 p.m. Alternating single lane closures on Southpoint Parkway between Route 1 and Pacific Drive for bridge construction.

Stafford County

 

Route 612 (Tacketts Mill Road)

Monday – Friday, 8 a.m. – 8 p.m. Alternating lane closures with flagging. Installation of high-friction surface treatment and pavement marking work between Poplar Road and Route 610.

Route 651 (Kellogs Mill Road)

Tuesday – Friday, 8:30 a.m. – 6 p.m. Alternating lane closures with flagging. Installation of high-friction surface treatment and pavement marking work between Shover Lane and Creek Lane.

Berea Church Road CLOSURE

Berea Church Road is closed from Berea Knolls Drive to Theresa Garden Place, and northbound access is closed from Route 17 to Berea Knolls Drive. Construction for a Stafford County project to improve Berea Church Road. View the project page.

Enon Road

Sunday – Thursday, 8 p.m. – 6 a.m. One-way, alternating traffic directed by a flagging crew between Route 1 and Truslow Road. Milling and paving.

Town and Country Drive

Monday – Friday, 9 a.m. – 8 p.m. One-way, alternating traffic directed by a flagging crew between Ferry Road and Route 218. Milling and paving and pavement markings.

Route 1540 (Walnut Grove Drive)

Monday – Friday, 9 a.m. – 3:30 p.m. Alternating lane closures with flagging for guardrail installation near Route 1541.

Secondary Route Paving Operations

Monday – Friday, 8:30 a.m. – 7 p.m. Milling and paving on Route 624 (Forbes Street/Primmer House Road/Morton Road/Layhill Road) between Route 1 and Riggs Road. Flaggers will alternate, one-way traffic through the work zone. Expect brief daytime delays.

Bridge Washing

Monday – Friday, 9 a.m. – 3:30 p.m. Bridge washing at multiple locations across Stafford. Lane closures and alternating one-way traffic at times directed by a flagging crew. Crews will be working along the following routes:

  • Route 1 over Accakeek Creek
  • Route 1 over Austin Run
  • Route 608 over Accakeek Creek
  • Route 608 over Potomac Creek
  • Route 610 over Aquia Creek, 9 a.m. – 2 p.m.
  • Route 626 over Potomac Creek
  • Route 626 over CSX railroad
  • Route 627 over Potomac Creek
  • Route 628 over CSX railroad
  • Route 630 over CSX railroad
  • Route 637 over I-95
  • Route 651 over Potomac Run
  • Route 653 over Branch of Potomac Creek
  • Route 684 over Rocky Run
  • Route 8900 over Potomac Creek

Additional Projects in Fredericksburg District

Gloucester County

Route 17 and Guinea Road Intersection Improvement

Construction is underway at the intersection of Route 17 and Route 216 (Guinea Road) in Gloucester County. On Guinea Road, the existing concrete median will be shifted slightly to allow for the construction of a dedicated left turn lane and a dedicated through lane for traffic approaching Route 17. The project will retain a dedicated right turn lane on Guinea Road. Sidewalk improvements will also be made at the intersection. Project completion is scheduled for July 2024.

King and Queen County and King William County

Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure

Dorrell Road/Spring Cottage Road is closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. The road will remain closed until early June 2025. A bridge superstructure replacement project is under design. The bridge closed for motorist safety in March 2023 after a routine inspection found significant deterioration in key bridge elements. A detour route is posted.

Spotsylvania County

I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Additional right turn lane added to Southpoint Parkway to Route 1 southbound. Project completion in Aug. 2025.

Route 3 and Orange Plank Road

Construction started in May 2024 to modify the intersection of Route 3 and Orange Plank Rd. to a new traffic pattern to enhance safety, improve traffic flow, and reduce conflict points. Project completion in summer 2024.

Route 17 (Mills Drive) Overpass Replacement and Widening

Construction started in Dec. 2020 to replace the existing two-lane interstate overpass on Route 17 with a four-lane bridge. Route 17 is being widened to four lanes until just east of the Hospital Boulevard/Germanna Point Drive intersection. A shared-use path, sidewalk, and pedestrian crossing equipment will be added as part of the project. Project completion was scheduled for late Feb. 2024. The project is now anticipated to be completed in late August 2024.

Route 208 (Courthouse Road) and Hood Drive

Hood Drive is reduced to a single lane between Route 1 and Route 208 (Courthouse Road), carrying only northbound traffic. Southbound traffic should follow the posted detour along Courthouse Road and Route 1 southbound. New right and left turn lanes are under construction at an entrance to a future Veterans Health Administration clinic. Additional turn lanes will be built on northbound Hood Drive approaching Courthouse Road. A raised median on Hood Drive will separate northbound and southbound traffic between Courthouse Road and McGowan Drive. Additional sidewalks, crosswalks, and pedestrian crossing equipment will be installed at the intersection. Project completion in late July 2024.

Route 606 (Mudd Tavern Road) Widening

Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be built parallel to Mudd Tavern Road, and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion in May 2025.

Lee Hill School Drive and Old Dominion Parkway Mini-Roundabout

Construction is underway to build a mini-roundabout at the Lee Hill School Drive and Old Dominion Parkway intersection. A roundabout traffic pattern is currently in place as construction continues to build the center island and median islands. Travelers can expect lane closures and periodic traffic control directed by a flagging crew as construction progresses. Passenger vehicles can pass through the intersection during construction. Tractor-trailers and oversized vehicles will be detoured for short durations to allow concrete to cure for islands. Mini roundabouts are circular intersections where all traffic moves in a counter-clockwise direction around a center island. Traffic entering the mini roundabout slows down and yields to traffic already inside. Mini roundabouts operate the same way as a traditional roundabout but have a smaller diameter and their paved center island can be driven over by trucks and other large vehicles when necessary. Project completion scheduled for early November 2024.

Westmoreland County

Route 658 (Monroe Bay Circle)

Monroe Bay Circle is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The bridge is a temporary measure to maintain traffic flow while a bridge replacement project is advanced.

Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This