Interstate 95 Southbound
Exit 136 (Centreport Parkway)
Monday – Friday, 9 a.m.-3 p.m. Single lane closure between mile marker 136-135 for fiber installation under permit.
Exit 126 (Spotsylvania)
Monday – Friday, 9 a.m.-3 p.m. Single lane closure between mile markers 126-125 for fiber installation under permit.
Exit 126 (Spotsylvania) Off-Ramp
Sunday – Saturday, 7 p.m.-10 a.m. Alternating single lane closures on the off-ramp from Interstate 95 southbound to Route 1. Construction to widen the ramp and build an additional right turn lane to Route 1 southbound.
City of Fredericksburg
Lafayette Boulevard
Monday, 7 a.m.-2 p.m. Right lane closure on Lafayette Boulevard between Twin Lake Drive and St. Pauls Drive. Two-lane traffic will be maintained by slighting shifting vehicles traveling south into a dual turn lane.
Fall Hill Avenue
Sunday – Tuesday, 9 a.m. – 3:30 p.m. Alternating lane closure on Fall Hill Avenue between Route 1 and Wallace Street. Flaggers will direct drivers through the work zone.
Caroline County
Route 17
Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures on Route 17 between Route 301 and Hazelwood Lane for paving work.
Route 301
Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures on Route 301 between the bridge over Mattaponi River and O’Brien Court for paving work.
Gloucester County
Route 17 Northbound and Southbound
Monday – Friday, 7 a.m.-5 p.m. Alternating lane closures on Route 17 between Bacon Fort Road and Hal Oaks Road for intersection safety improvement project.
Route 17 Northbound
Sunday – Thursday, 9 p.m.-6 a.m. Alternating lane closures on Route 17 northbound between Route 3 and Route 216 for bridge repairs.
Wednesday, 7 a.m. – 3:30 p.m. Alternating lane closures on Route 17 northbound between Cannon Way and Fleming Rilee for trench widening work.
Route 17 Southbound
Monday – Friday, 9 a.m.-3 p.m. Alternating lane closure between Main Street and Hall Town Road, Main Street and TC Walker Road, for milling and paving work.
King George County
Route 3 (Kings Highway)
Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures for paving work between Route 607 (Port Conway Road) and Stafford County line.
Route 301 Southbound
Monday – Friday, 7 a.m.-3:30 p.m. Single lane closure for slope and pipe repair.
Route 603 (Fletchers Chapel Road)
Monday – Tuesday, 9 a.m.- 7 p.m. Alternating lane closures with flagging for paving work between Route 3 and Route 218 (Caledon Road). Flaggers will alternate one-way traffic through the work zone.
King and Queen County
Route 634 (Mt. Elba Road) CLOSED
24/7. Mt. Elba Road will be closed for at least 45 days to allow crews to replace the culvert and restore the roadway after being damaged from severe weather on Wednesday, March 5. Detour is Route 629 (Walkerton Landing Road) and Route 633 (Stones Road).
Lancaster County
Surface Treatment
Monday – Friday, 9 a.m. – 7 p.m. Alternating lane closures with flagging for paving work on the following routes:
Route 638 (Shady Lane)
Route 639 (Beach Road)
Route 652 (Shadyh Lane)
Route 825 (Yorkshire Street)
Route 1010 (Wiggins Avenue)
Route 1013 (W. Church Street)
Route 1016 (Bellevue Road)
Route 1043 (Lee Road)
Lancaster and Middlesex County
Route 3 at Norris Bridge
Tuesday – Friday, 7 p.m.-6 a.m. and Friday – Saturday, 7 p.m.-9 a.m. Alternating lane closures with automatic flagging devices directing traffic through the work zone for structural steel rehabilitation project on the Robert O. Norris Jr. Bridge. Learn more here.
Mathews County
Route 613 (Callis Field Lane/Beaverdam Road)
Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures with flagging between Route 14 and Tabernacle Road for paving work.
Route 622 (Evans Road/Long Road)
Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures with flagging between Glebe Road and end of state maintenance for paving work.
Sail Cove Subdivsion
Monday – Friday, 7 a.m.- 5 p.m. Alternating lane closures with flagging for paving work on various routes in the subdivision, including Skipjack Lane.
Surface Treatment
Wednesday – Friday, 7 a.m.-7 p.m. Alternating lane closures with flagging for paving work on the following routes:
Route 633
Route 634
Route 661
Route 662
Route 663
Route 664
Route 652
Route 668
Route 669
Route 680
Northumberland County
Surface Treatment
Monday – Friday, 7 a.m.-5 p.m. Alternating lane closures with flagging for paving work on the following routes:
Route 604 (Mob Neck Road) between Route 640 (Hull Neck Road) and Route 1120 (Cubitt Creek Road)
Route 604 (Snydors Millpond Road) between Route 694 (Avalon Lane) and Route 640 (Hull Neck Road)
Route 629 (Font Hill Road) between Route 630 (Walnut Point Road) and Route 636 (Newmans Neck Road)
Route 1016 (Oak Ridge Avenue) between Lancaster County line and Route 1005 (Clifton Avenue)
Richmond County
Surface Treatment
Monday – Friday, 7 a.m.-5 p.m. Alternating lane closures with flagging for paving work on the following routes:
Route 1004 (Court Circle) near Route 360 (Richmond Highway)
Route 1035 (College Avenue) between Route 360 (Richmond Road) and Route 1038 (Freedom Way)
Route 1036 (Campus Drive) between Route 1004 (Court Circle) and Route 1015 (Wallace Street)
Spotsylvania County
Route 1
Monday – Friday, 9 a.m.-3 p.m. All travel lanes will remain open, but the alignment of the Route 1 travel lanes has shifted slightly between Arcadia Road and Mudd Tavern Road for road improvement work connected with the Kalahari Resorts & Conventions development. Permit work. Construction will also be underway along the road shoulder.
Route 1 Northbound and Southbound
Sunday – Saturday, 7 p.m.-10 a.m. Alternating single and double lane closures on Route 1 between the I-95 southbound off-ramp and Southpoint Parkway. Single lane closures start at 7 p.m. and double lane closures start at 9 p.m.
Route 2 (Tidewater Trail)
Monday – Friday, 9 p.m.- 5 a.m. Single lane closure between Benchmark Road and Pierson Drive. Installation of water main under permit.
Route 606 (Morris Road)
Sunday – Wednesday, 7 p.m. – 5 a.m. Closure of right turn lane on Morris Road into shopping center at 7 p.m. and at 8:30 p.m.alternating lane closures on Morris Road between Route 1 and Taveneer Lane for waterline work.
Route 608 (Massaponax Church Road)
Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Hickory Hill Drive and Summit Crossing Road with one-way, alternating traffic. Installation of water main under permit.
Route 610 (Old Plank Road)
Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Lewis Thornburg Road and Pullen Drive with one-way, alternating traffic. Installation of roundabout under permit.
Monday – Wednesday, 9 a.m. – 3:30 p.m. Flaggers will alternate, one-way traffic on Old Plank Road near Harrison Road for road widening project. Expect brief delays.
Route 620 (Harrison Road)
Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Kingswood Boulevard and Salem Church Road/Leavells Road with one-way, alternating traffic. Installation of water main under permit. Click here for Spotsylvania County project page.
Route 627 (Gordon Road)
Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures on Gordon Road between Old Plank Road and Legacy Woods Drive for road widening project.
Route 639 (Leavells Road)
Monday – Friday, 9 a.m.-3:30 p.m. and 8 p.m.-6 a.m. Alternating lane closures for bridge repair work at Massaponax Creek.
Enchanted Woods Way
Monday – Thursday, 7 a.m. – 4:30 pm Alternating single lane closures for pipe replacement at the intersection of Enchanted Woods Way and Runnymeade Trail. Flaggers will direct traffic through the work zone.
Leavells Crossing Subdivision
Monday – Friday, 9 a.m.-7 p.m. Flagging operation for milling and paving on various routes in the subdivision.
Southpoint Parkway
Sunday – Saturday, 7:30 p.m.-5:30 a.m. and Monday – Thursday, 9 a.m.-3:30 p.m. Alternating single lane closures for paving work.
Spotsylvania Parkway
Monday – Friday, 9 a.m.-3:30 p.m. Alternating single lane closures on Southpoint Parkway between Deep Creek Drive/New Berne Road and Holley Oak Drive/Yellow Birch Drive to allow crews to install a rectangular rapid flashing beacon (RRFB). The existing crosswalk is between two Lee’s Parke subdivisions. An RRFB is a pedestrian-activated device that emits rapidly flashing yellow LED lights at a crosswalk. Learn more here.
Summers Landing subdivision
Monday – Friday, 9 a.m.-7 p.m. Mobile work to apply shoulder stone on various routes in the subdivision.
Stafford County
Route 17 Southbound
Monday – Thursday, 9 a.m.-3 p.m. Intermittent right lane closures on southbound Route 17 between Village Parkway and Hartwood Church Road to install waterline and sewer line under permit.
Route 603 (Caisson Road)
Monday – Friday, 9 a.m. – 7 p.m. Flagging between Route 3 and Route 218 (White Oak Road) for paving work. Flaggers will alternate one-way traffic through the work zone.
Route 607 (Cool Springs Road)
Monday – Friday, 9 a.m.-3 p.m. Single lane closures between Route 3 Business and Route 218 (White Oak Road). Fiber installation under permit.
Route 610 (Garrisonville Road)
Monday – Friday, 8 p.m.-5 p.m. Alternating lane closures at the Route 684 (Mind Road) and Route 684 (Staffordboro Boulevard) intersection for signal work.
Route 654 (Banks Ford Parkway)
Monday – Friday, 7 a.m. – 5 p.m. Alternating lane closures between Celebrate Virginia Parkway and Route 17 for pavement marking work.
Route 654 (Berea Church Road) CLOSURE
Berea Church Road is closed from Berea Knolls Drive to Theresa Garden Place, and northbound access is closed from Route 17 to Berea Knolls Drive. Construction for a Stafford County project to improve Berea Church Road. View the project page.
Route 753 (Enon Road)
Monday – Friday, 9 a.m.-3 p.m. Single lane closures between Route 1 and Truslow Road. Fiber installation under permit.
Route 1968 (Celebrate Virginia Parkway)
Monday – Friday, 7 a.m. – 5 p.m. Alternating lane closures between Route 17 and end of state maintenance for pavement marking work.
Berea Plantation Subdivision
Monday – Tuesday, 9 a.m.-7 p.m. Flagging operation for milling and paving on various routes in the subdivision.
Rosedale Plantation
Tuesday – Wednesday, 9 a.m.-7 p.m. Flagging operation for milling and paving on various routes in the subdivision.
Roseville Plantation
Thursday – Friday, 9 a.m.-7 p.m. Flagging operation for milling and paving on various routes in the subdivision.
Westmoreland County
Route 631 (Longfield Road)
Monday – Friday, 7 a.m.-5p.m. Alternating lane closures for paving work between Route 205 (James Monroe Highway) and Route 205 (Ridge Road).
Additional Projects in Fredericksburg District
Caroline County
Route 638 (South River Road) Bridge Replacement
Construction is underway to replace the Route 638 (South River Road) bridge over South River. A portion of South River Road is closed with a detour in place. The project will be complete by Sept. 2025.
City of Fredericksburg
Route 1 at Fall Hill Avenue, and
Route 1 at Princess Anne Street and Hanson Avenue
Intersection improvement projects are underway on Route 1 at the intersections with Fall Hill Avenue and Princess Anne Street/Hanson Avenue. Construction will be complete by June 2026. Intermittent single lane and shoulder closures will be needed at times, but most lane closures will occur overnight, and outside of peak weekday commute times.
Lafayette Boulevard at Twin Lakes/Kensington
Construction is underway on a $2.4 million bicycle and pedestrian connector project. Most construction will occur on the road shoulders and outside of the travel lanes. The project will be complete by Nov. 2025.
Gloucester County
Route 17 and Woods Cross Road Intersection Safety Improvement
The $5.1 million project will begin Monday, March 24 to improve safety and modify the Route 17 and Route 610 (Woods Cross Road/Davenport Road) intersection. Once work is complete, left turns and through movements are prohibited at the intersection. All side street approaches will begin with a right turn. Drivers will turn right onto Route 17 at the intersection before making a U-turn at designated locations. Construction is expected to be complete by Dec. 16, 2025.
Gloucester County and Mathews County
Route 3/14 Westbound Bridge Rehabilitation
A major bridge rehabilitation project is underway on the Route 3/Route 14 westbound bridge over Burke Mill Stream, which is located at the Mathews and Gloucester line. Crews are improving the 76-year-old structure by replacing the bridge deck, beams, bridge railings, and guardrails. The westbound Route 3/14 travel lanes are closed at Windsor Road. Eastbound and westbound Route 3/14 traffic is crossing the eastbound bridge, with one lane open in each direction. Left turns from Windsor Road to Route 14 eastbound are prohibited. Project completion in Nov. 2025.
King and Queen County
Route 614 (Rock Spring Road) Culvert Repair and Bridge Replacement
Rock Spring Road is closed for a culvert repair and a bridge replacement project. Rock Spring Road will reopen to through travelers in Dec. 2025. A culvert repair was recently completed, and separate crews will be mobilizing at the bridge over Exol Swamp. The road will remain closed to through traffic at Exol Swamp for approximately 10 months. The existing Exol Swamp bridge was built in 1965 and has a weight posting of 15 tons. Motorists should follow the posted detour route.
King and Queen County and King William County
Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure
Dorrell Road/Spring Cottage Road is closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. A detour route is posted. Construction is underway on a major bridge rehabilitation project. The road will remain closed until early June 2025. The bridge closed for motorist safety in March 2023 after a routine inspection found significant deterioration in key bridge elements.
Spotsylvania County
I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound
A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Project completion in Aug. 2025.
Route 606 (Mudd Tavern Road) Widening
Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, is under construction parallel to Mudd Tavern Road and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion in May 2025.
Route 620 (Harrison Road) Reconstruction and Widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion late summer 2026.
Westmoreland County
Route 658 (Monroe Bay Circle)
Monroe Bay Circle is closed at the bridge over Monroe Creek, as construction begins to build a new bridge over Monroe Creek. Motorists are to follow the posted detour. Monroe Bay Circle will be closed until the new bridge opens in Sept. 2025.
Commuting and Ridesharing Information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.