;

Area road work this week

by | Oct 7, 2024 | Ted Schubel, Transportation

I-95 Northbound and Southbound

Exit 104 (Carmel Church) to Exit 136 (Centreport Parkway)

Wednesday – Thursday, 9 p.m.-5 a.m. Single lane closures for mobile operation to repair potholes between mile markers 101-136.

Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)

Sunday – Thursday, 9 p.m.-4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 145, at the Aquia Creek Bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.

I-95 Northbound

Exit 136 (Centreport Parkway) to Exit 140 (Courthouse Road)

Sunday – Thursday, 9 p.m.-4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 137, at the Potomac Creek bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.

City of Fredericksburg

Route 3 (Blue and Gray Parkway)

Monday – Tuesday, 9 a.m.-3 p.m. Single eastbound lane closure on the Blue and Gray Parkway over Route 2. Routine, scheduled bridge inspection.

City of Fredericksburg and Stafford County

Route 1 at Falmouth Bridge

Monday – Thursday, 9 a.m.-3:30 p.m. Alternating single northbound and southbound lane closures on Route 1 over the Rappahannock River, also known as Falmouth Bridge. Routine, scheduled bridge inspection.

Route 3 (Blue and Gray Parkway)

Thursday – Friday, 9 a.m.-4 p.m. Alternating single lane closures on Route 3 over the Rappahannock River. Routine, scheduled bridge inspection.

Essex County

Route 360

Sunday – Thursday, 9 p.m.-5 a.m. Alternating lane closures on Route 360 eastbound and westbound at the bridge over Piscataway Creek for maintenance work.

Gloucester County

Pavement Marking

Monday – Tuesday, 9 a.m.-3:30 p.m. Mobile lane closures for pavement marking work along Route 198.

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Route 17 (Main Street)

Route 3/14

Route 14

Route 198 (Dutton Road)

Route 604

Route 605 (Crab Thicket Road)

Route 605 (Indian Road)

Route 606 (Farys Mill Road)

Route 607 (Fletcher Road)

Route 614 (Hickory Fork Road)

Route 614 (Short Lane)

Route 632 (Aberdeen Creek Road)

Route 678 (Harcum Road)

Route 727 (Owen Street)

King George County

Fletchers Chapel Road

Monday – Friday, 9 a.m.-2:15 p.m. Flagging operation at the bridge over CSX railroad tracks for maintenance work.

Pavement Marking

Monday – Friday, 9 a.m.-3:30 p.m. Alternating, one-way traffic with flaggers directing drivers through the work zone along the following routes:

Route 604 (12th Street)

Route 614 (Potomac Drive)

Route 670 (15th Street)

Secondary Road Resurfacing

Monday – Friday, 7 a.m.-7 p.m. Alternating, one-way traffic along the following routes for surface treatment. Flaggers will direct drivers through the work zone.

Route 605

Route 627

Route 632

Route 653

Route 658

Route 681

Route 688

Route 714

King and Queen County

Lord Delaware Bridge

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures on Route 33 over the Mattaponi River, at the Lord Delaware Bridge. Bridge cleaning.

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Route 14 (The Trail) to Route 631 (Bunker Hill Road)

Route 14 (The Trail) to Route 659 (Mantapike Landing Road)

Route 619 (Owens Mill Road)

Route 623 (Indian Neck Road) to Route 721 (Newtown Road)

Route 631 (Stevensville Road)

Route 631 (Bunker Hill Road)

Route 631 (Smithfield Road)

Route 635 (Bradley Farm Road)

King William County

Eltham Bridge

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures on Route 33 over the Pamunkey River for bridge maintenance.

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures on Route 33 over the Pamunkey River for bridge cleaning.

Route 33 over West Point Creek

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures on Route 33 over West Point Creek for bridge cleaning.

Sign Work

Monday – Friday, 9 a.m.- 4 p.m. Alternating mobile lane closures with flagging operations for sign work on various secondary routes.

Lancaster and Middlesex County

Route 3 over Rappahannock River (Norris Bridge)

Monday – Friday, 9 a.m.-3:30 p.m. Norris Bridge annual safety inspection. Automated flagging devices will alternate, one-way traffic through the work zone. Flagging crews operate the devices, which can be rapidly adjusted to respond to congestion or incidents on the bridge.

Lancaster County

Little Bay Road

Monday – Friday, 9 a.m.-3:30 p.m. Alternating mobile lane closures with flagging operations. Pavement marking.

Pavement Marking

Tuesday – Friday, 9 a.m.-3:30 p.m. Alternating mobile lane closures with flagging operations on various primary and secondary routes including Route 3, Route 201, Route 222 and Route 354.

Mathews County

Pavement Marking

Monday – Tuesday, 9 a.m.-3:30 p.m. Alternating lane closures on the following routes for pavement markings:

Route 14

Route 198

Route 223

Route 600

Route 602

Route 604

Route 633

Middlesex County

Pavement Marking

Monday – Friday, 9 a.m.-3:30 p.m.  Alternating lane closures with flagging on the following routes in the Town of Urbanna:

Colorado Avenue

Cross Street

Prince George Street

Upton Lane

Virginia Street

Richmond County

Downing Bridge

Sunday – Thursday, 9 p.m.-5 a.m. One-way, alternating traffic on the Route 360 bridge over the Rappahannock River between the Town of Tappahannock and Richmond County. Bridge maintenance.

Route 360 (Richmond Road)

Sunday – Thursday, 8 p.m.-5 a.m. Milling and paving at various locations on Route 360 between the Downing Bridge and Route 3.

Pavement Marking

Thursday – Friday, 9 a.m.-3:30 p.m. Mobile operation for pavement marking at various locations on both Route 3 eastbound and westbound, Route 3 Business (Main Street) and Route 360 eastbound and westbound.

Spotsylvania County

Route 1

Wednesday, 9 a.m.-3 p.m. All travel lanes will remain open, but the alignment of the Route 1 travel lanes will be shifted slightly between Arcadia Road and Mudd Tavern Road for road improvements connected with the Kalahari Resorts & Conventions development. Permit work. Construction will also be underway along the road shoulder between 9 a.m. and 3 p.m. Monday-Friday.

Route 1 Southbound

Sunday – Thursday, 7 p.m.-7 a.m. Single lane closures between the I-95 southbound off-ramp and Mills Drive for traffic signal work.

Monday – Friday, 9 a.m.-3 p.m. Route 1 southbound right turn lane closure between Route 17 and Spotsylvania Parkway. Permit work. Construction of right turn lane.

Route 2/17 (Tidewater Trail)

Monday – Friday, 9 a.m.- 3:30 p.m. Flagging operation for work at the Glendas Way intersection.

Route 3 Eastbound and Westbound

Monday – Friday, 6 a.m.-2 p.m. Single lane closures between Spotswood Furnace Road and Corter Avenue for permit work.

Route 208 (Lake Anna Parkway)

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures at the Route 608 (Robert E. Lee Drive) intersection for signal work.

Days Bridge Road

Monday – Friday, 9 a.m.- 5 p.m. Bridge repairs. Alternating lane closures at the bridge over Lake Anna.

Harrison Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Kingswood Boulevard and Leavells Road with one-way, alternating traffic. Installation of water main under permit.

Massaponax Church Road

Monday, 9 a.m.-2:15 p.m. Road work at the intersection of Massaponax Church Road and Lancaster Gate Road. Permit work.

Spotsylvania Parkway

Monday – Friday, 9 a.m.-3:30 p.m. Bridge cleaning. Alternating lane closures at the bridge over I-95.

Southpoint Parkway

Sunday, 9 p.m.-5:30 a.m. Single lane closure between Pacific Drive and Route 1.

Monday – Thursday, 9 a.m.-3:30 p.m. and 7:30 p.m.-5:30 a.m. Single lane closure between Pacific Drive and Route 1.

Friday, 9 a.m.-noon. Single lane closure between Pacific Drive and Route 1.

Spotsylvania Parkway

Monday – Friday, 9 a.m.-3:30 p.m. Bridge cleaning. Alternating lane closures at the bridge over I-95.

Stafford County

Route 1 Northbound and Southbound

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures for pavement marking between the Potomac Creek bridge and Hospital Center Boulevard.

Monday – Friday, 9 a.m.- 3 p.m. Single lane closure between South Campus Boulevard and Potomac Creek. Fiber installation. Permit work.

Route 1 Southbound

Monday – Friday, 9 a.m.- 3 p.m. Single lane closure between Layhill Road and Potomac Creek Drive. Utility installation. Permit work.

Route 17 Northbound and Southbound

Sunday – Thursday, 9 p.m.-5 a.m. Alternating lane closures on Route 17 northbound and southbound near the Fauquier County line for bridge repairs.

Route 17 Southbound

Sunday – Friday, 8 p.m.-6 a.m. Alternating lane closures on Route 17 southbound between the Fauquier County line and Hartwood Road for various paving, milling, and pavement marking activities.

Monday – Thursday, 9 a.m.-3 p.m. Single southbound lane closure between Hartwood Church Road and Clark Patton Road. Tree clearing for utility work. Permit work.

Route 610 (Garrisonville Road)

Monday – Friday, 9 a.m.-3 p.m. Single lane closure on Route 610 between Algrace Boulevard and Ripley Road. Construction for turn lane extension. Permit work.

Berea Church Road CLOSURE

Berea Church Road is closed from Berea Knolls Drive to Theresa Garden Place, and northbound access is closed from Route 17 to Berea Knolls Drive. Construction for a Stafford County project to improve Berea Church Road. View the project page.

Brent Point Road

Monday – Friday, 9 a.m.-3:30 p.m. Pavement markings. Flaggers will alternate one-way traffic on Brent Point Road between Arkendale Road and end of state maintenance.

Brooke Road

Monday – Friday, 7 a.m.-3 p.m. Drainage work. Be alert to flagging crew alternating, one-way traffic between Andrew Chapel Road and Millbrook Road.

Decatur Road

Monday – Friday, 9 a.m.-3:30 p.m. Pavement markings. Flaggers will alternate one-way traffic on Decatur Road between Norman Road and Indian View Court.

Northhampton Boulevard

Monday – Friday, 9 a.m.-7 p.m. One-way, alternating traffic directed by a flagging crew between Mine Road and Eustace Road. Pavement marking.

Richland Road

Monday – Friday, 9 a.m.-7 p.m. One-way, alternating traffic directed by a flagging crew. Pavement marking.

Bridge Cleaning

Monday – Friday, 9 a.m.-3:30 p.m. Alternating mobile lane closures with flagging operations for bridge cleaning on the following routes:

Route 607 (Cool Springs Road) over CSX railroad tracks

Route 624 (Primmer House Road) over CSX railroad tracks

Route 652 (Truslow Road) over I-95

Pavement Marking Work

Sunday – Thursday, 8 p.m.-5 a.m. Alternating mobile lane closures with potential flagging operations to allow crews to apply pavement markings on various primary and secondary routes around Stafford County, including Route 1, Route 3, and Route 610.

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Hartwood Road to Cropp Road

Heflin Road to Beaver Lodge Road

Kellogg Mill Road

Kellogg Mill Road to Truslow Road

Mt. Olive Road to Poplar Road

Poplar Road to Berea Church Road

Poplar Road to Hartwood Road

Shackelford Well Road

Spotted Tavern Road

Tacketts Mill Road

Truslow Road

The Willows Subdivision

Monday – Wednesday, 9 a.m.-6 p.m. Milling and paving on various routes. Flaggers will alternate, one-way traffic through the mobile work zone.

Additional Projects in Fredericksburg District

Caroline County

Route 638 (South River Road) Bridge Replacement

Construction is underway to replace the Route 638 (South River Road) bridge over South River. A portion of South River Road is closed with a detour in place. The project will be complete by Sept. 2025.

Gloucester County and Mathews County

Route 3/14 Westbound Bridge Rehabilitation

A major bridge rehabilitation project is underway on the Route 3/Route 14 westbound bridge over Burke Mill Stream, which is located at the Mathews and Gloucester line. Crews are improving the 76-year-old structure by replacing the bridge deck, beams, bridge railings, and guardrails. In late October 2024, the westbound Route 3/14 travel lanes will close at Windsor Road and eastbound and westbound Route 3/14 traffic will both cross the eastbound bridge over Burke Mill Stream, with one lane open in each direction. Left turns from Windsor Road to Route 14 eastbound are prohibited. Project completion in Nov. 2025.

King and Queen County

Route 621 (Bruington Road) over Dickeys Swamp

Bruington Road is closed to through traffic at the bridge over Dickeys Swamp, with a posted detour along Route 14 and Route 360. This is one of multiple bridges undergoing repair as part of the $3.1 million bridge maintenance project in the Northern Neck and Middle Peninsula to address structure scour. Scour is the erosion of soil around a bridge’s foundation. Weather permitting, the road will reopen in mid-Dec. 2024.

King and Queen County and King William County

Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure

Dorrell Road/Spring Cottage Road is closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. A detour route is posted. Construction is underway on a major bridge rehabilitation project. The road will remain closed until early June 2025. The bridge closed for motorist safety in March 2023 after a routine inspection found significant deterioration in key bridge elements.

Spotsylvania County

I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Project completion in Aug. 2025.

Route 3 Westbound Culvert Installation at Lick Run

Crews installed a new culvert on Route 3 westbound over Lick Run during the weekend of Sept. 13-16, 2024. Periodic single lane closures will continue at Lick Run for paving and other final construction activities. Project completion in early Nov. 2024.

Route 17 (Mills Drive) Overpass Replacement and Widening

Route 17 was widened from two to four lanes from just east of the Hospital Boulevard/Germanna Point Drive intersection to west of a new four-lane I-95 overpass built by this project. Improvements included a shared-use path, sidewalk, crosswalks, and pedestrian crossing signal equipment. New travel lanes are open, but additional construction activity continues. Project completion was originally scheduled for Feb. 2024.

Route 606 (Mudd Tavern Road) Widening

Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, is under construction parallel to Mudd Tavern Road, and it will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion in May 2025.

Route 620 (Harrison Road) Reconstruction and Widening

Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion late summer 2026.

Stafford County

Banks Ford Parkway and Celebrate Virginia Parkway Modular Roundabout

Construction to install a modular roundabout is underway at the intersection of Banks Ford Parkway and Celebrate Virgina Parkway. Crews are installing modular roundabout pieces, which are made from recycled material. Signs and pavement markings will guide motorists through the roundabout. Project completion in late Oct. 2024.

Westmoreland County

Route 658 (Monroe Bay Circle)

Monroe Bay Circle is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The road is scheduled to close at the bridge on Monday, Oct. 21, as construction begins to build a new bridge over Monroe Creek. Motorists will follow a posted detour. Monroe Bay Circle will be closed until the new bridge opens in Sept. 2025.

Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This