;

Area road work this week

by | Sep 23, 2024 | Ted Schubel, Transportation

I-95 Northbound and Southbound

Exit 136 (Centreport Parkway) to Exit 140 (Courthouse Road)

Monday – Thursday, 9 p.m.-4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 137, at the Potomac Creek bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.

Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)

Monday – Thursday, 9 p.m.-4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 145, at the Aquia Creek Bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.

I-95 Northbound

Exit 136 (Centreport Parkway) to Exit 140 (Courthouse Road)

Wednesday – Thursday, 9 p.m.-5 a.m. Single lane closures for pavement marking work between mile markers 137-140.

Caroline County

Ladysmith Road

Sunday – Friday, 8 p.m.-6 a.m. Alternating lane closures with flagging operation for pavement marking between Partlow Road and Bridlewood Lane.

Monday – Friday, 9 a.m.-7 p.m. Alternating lane closures with flagging operation for pavement marking between Partlow Road and Bridlewood Lane.

Gloucester County

Pavement Markings

Thursday – Friday, 9 a.m.-3:30 p.m. Mobile lane closures for pavement marking work along Route 198.

Secondary Road Resurfacing: Quail Hollow and Founders Mill

Monday – Friday, 7 a.m.-5 p.m. Alternating lane closures in the Quail Hollow and Founders Mill subdivisions for resurfacing. Crews will be applying slurry seal, part of a cape seal resurfacing project.

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Route 17 (Main Street)

Route 3/14

Route 14

Route 198 (Dutton Road)

Route 604

Route 605 (Crab Thicket Road)

Route 605 (Indian Road)

Route 606 (Farys Mill Road)

Route 607 (Fletcher Road)

Route 614 (Hickory Fork Road)

Route 614 (Short Lane)

Route 632 (Aberdeen Creek Road)

Route 678 (Harcum Road)

Route 727 (Owen Street)

King George County

Surface Treatment

Monday – Friday, 7 a.m.-7 p.m. Alternating, one-way traffic along the following routes for surface treatment. Flaggers will direct drivers through the work zone.

Route 600

Route 612

Route 616

Route 629

Route 635

Route 638

Route 654

Route 664

King and Queen County

Bridge Cleaning

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures on Route 33 over Mattaponi River for bridge cleaning.

Sign Work

Monday – Friday, 9 a.m.- 4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Route 14 (The Trail) to Route 631 (Bunker Hill Road)

Route 14 (The Trail) to Route 659 (Mantapike Landing Road)

Route 619 (Owens Mill Road)

Route 623 (Indian Neck Road) to Route 721 (Newtown Road)

Route 631 (Stevensville Road)

Route 631 (Bunker Hill Road)

Route 631 (Smithfield Road)

Route 635 (Bradley Farm Road)

King William County

Bridge Cleaning

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures at the following locations for bridge cleaning:

 

Route 33 over West Point Creek

Route 33 over Mattaponi River

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with traffic directed by a flagging crew. Sign work along the following routes:

Acquinton Church Road

Calno Road

Commins Road

Etna Mills Road

Globe Road

Hanover Quarter Road to Calno Road

Mt. Pleasant Road to Pampatike Road

Route 30 (King William Road) to Epworth Road

Upshaw Road

Upshaw Road to Newman Drive

Walkerton Road

W. River Road

Woodbury Road to White Marsh Lane

Lancaster and Middlesex County

Route 3 over Rappahannock River (Norris Bridge)

Monday – Friday, 9 a.m.-3:30 p.m. Norris Bridge annual safety inspection. Automated flagging devices will alternate, one-way traffic through the work zone. Flagging crews operate the devices, which can be rapidly adjusted to respond to congestion or incidents on the bridge.

Middlesex County

Bridge Cleaning

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures at the following locations for bridge cleaning:

 

Route 227 over Urbanna Creek

Route 603 over Dragon Run

Spotsylvania County

Route 1 Northbound and Southbound

Monday – Friday, 7 p.m.-7 a.m. Single lane closures between the I-95 southbound off-ramp and I-95 northbound on-ramp and Southpoint Parkway. Traffic signal work.

Route 1 Southbound

Monday – Friday, 9 a.m.-3 p.m. Route 1 southbound right turn lane closure between Route 17 and Spotsylvania Parkway. Permit work. Construction of right turn lane.

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Commonwealth Drive and Palmers Creek Way. Utility work.

Route 3 (Plank Road/Central Park Boulevard)

Tuesday – Wednesday, 11 p.m.-7 a.m. Sign removal at the corner of Plank Road and Central Park Boulevard with lane closures between Plank Road and Commerce Street.

Route 3 Eastbound and Westbound

Monday – Friday, 6 a.m.-2 p.m. Single lane closures between Spotswood Furnace Road and Corter Avenue for permit work.

Monday – Friday, noon-5:30 a.m. Eastbound and westbound single lane closures near Lick Run, between the Spotsylvania County Museum and Montpelier Drive and Glade Drive. Reconstruction work on crossovers.

Route 208 (Courthouse Road)

Monday – Thursday, 9 p.m.-5 a.m. Single lane closure for guardrail installation near the Crown Grant Drive intersection.

Block House Road

Sunday – Thursday, 8 p.m.-6 a.m. Flaggers will direct alternating one-way traffic between Route 208 and Partlow Road. Pavement marking.

Hall Industrial Drive

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation near the Massaponax Church Road intersection.

Harrison Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Kingswood Boulevard and Leavells Road with one-way, alternating traffic. Installation of water main under permit.

Hospital Boulevard

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between the roundabout and Route 17 (Mills Drive). Pavement marking.

Massaponax Church Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure with one-way, alternating traffic between Route 17 and Cedar Forest Drive. Permit work.

Smith Station Road

Sunday – Tuesday, 8 p.m.-6 a.m. Single lane closure on Smith Station Road between Leavells Road and Courthouse Road, with traffic directed by a flagging crew. Pavement marking.

Sunday – Friday, 8 p.m.-6 a.m. Single lane closure on Smith Station Road between Massaponax Church Road and Spotsylvania Parkway for permit work. Utility installation.

Southpoint Parkway

Monday – Thursday, 9 a.m.-3:30 p.m. Single lane closure between Pacific Drive and Route 1.

Spotsylvania Parkway

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between Hospital Boulevard and Route 1. Pavement marking.

Towles Mill Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation near the Route 208 intersection.

Stafford County

Route 1 Northbound and Southbound

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures for pavement marking between the Potomac Creek bridge and Hospital Center Boulevard.

Monday – Tuesday, 10 p.m.-5 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at Telegraph Road.

Monday – Friday, 9 a.m.- 2:15 p.m. Single lane closures for permit work between Centreport Parkway and Potomac Creek Drive. Inlaid pavement markers.

Monday – Friday, 9 a.m.- 3 p.m. Single lane closures for permit work between South Campus Boulevard and Potomac Creek Drive. Fiber installation.

Tuesday – Wednesday, 8 p.m.-7 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at St. Micheal Street, approximately a half-mile south of Centreport Parkway.

Tuesday – Wednesday, 10 p.m.- 7 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at intersection of I-95 northbound on-ramp and Route 1 at exit 143 (Aquia/Garrisonville)

Route 1 Northbound

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Forbes Street and Manning Drive. Permit work. Utility installation.

Monday – Thursday, 9 p.m.- 5 a.m. Single lane closure for guardrail installation near Route 676 and Route 687.

Route 17 Southbound

Sunday – Friday, 8 p.m.-6 a.m. Alternating lane closures for pavement marking between the Stafford/Fauquier County line and Marsh Road.

Monday – Thursday, 9 a.m.-3 p.m. Alternating northbound and southbound single lane closures between Hartwood Church Road and Clark Patton Road. Permit work. Crews will be clearing trees for utility line installation.

Route 610 at Mine Road

Wednesday – Friday, 9 p.m.-5 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at Mine Road intersection.

Route 610 Westbound

Sunday – Monday, 9 p.m.-7 a.m. Varying single and double westbound lane closures for bridge joint repair at the I-95 overpass. Double lane closures permitted 10 p.m. to 5 a.m.

Berea Church Road CLOSURE

Berea Church Road is closed from Berea Knolls Drive to Theresa Garden Place, and northbound access is closed from Route 17 to Berea Knolls Drive. Construction for a Stafford County project to improve Berea Church Road. View the project page.

Northhampton Boulevard

Monday – Friday, 9 a.m.-7 p.m. One-way, alternating traffic directed by a flagging crew between Mine Road and Eustace Road. Pavement marking.

Sign Work

Monday – Friday, 9 a.m -4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Hartwood Road to Cropp Road

Heflin Road to Beaver Lodge Road

Kellogg Mill Road

Kellogg Mill Road to Truslow Road

Mt. Olive Road to Poplar Road

Poplar Road to Berea Church Road

Poplar Road to Hartwood Road

Shackelford Well Road

Spotted Tavern Road

Tacketts Mill Road

Truslow Road

 

Washington Street

Monday – Friday, 9 a.m.-3 p.m. Single lane closure near the Route 17 Business intersection. Guardrail installation.

Additional Projects in Fredericksburg District

Caroline County

Route 638 (South River Road) Bridge Replacement

Construction is underway to replace the Route 638 (South River Road) bridge over South River. A portion of South River Road is closed with a detour in place. The project will be complete by Sept. 2025.

Gloucester County and Mathews County

Route 3/14 Westbound Bridge Rehabilitation

A major bridge rehabilitation project is underway on the Route 3/Route 14 westbound bridge over Burke Mill Stream, which is located at the Mathews and Gloucester line. Crews are improving the 76-year-old structure by replacing the bridge deck, beams, bridge railings, and guardrails. In early-to-mid October 2024, the westbound Route 3/14 travel lanes will close at Windsor Road and eastbound and westbound Route 3/14 traffic will both cross the eastbound bridge over Burke Mill Stream, with one lane open in each direction. Left turns from Windsor Road to Route 14 eastbound are prohibited. Project completion in Nov. 2025.

King and Queen County

Route 621 (Bruington Road) over Dickeys Swamp

Bruington Road is closed to through traffic at the bridge over Dickeys Swamp, with a posted detour along Route 14 and Route 360. This is one of multiple bridges undergoing repair as part of the $3.1 million bridge maintenance project in the Northern Neck and Middle Peninsula to address structure scour. Scour is the erosion of soil around a bridge’s foundation. Weather permitting, the road will reopen in mid-Dec. 2024.

King and Queen County and King William County

Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure

Dorrell Road/Spring Cottage Road is closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. A detour route is posted. Construction is underway on a major bridge rehabilitation project. The road will remain closed until early June 2025. The bridge closed for motorist safety in March 2023 after a routine inspection found significant deterioration in key bridge elements.

Spotsylvania County

I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Project completion in Aug. 2025.

Route 3 Westbound Culvert Installation at Lick Run

Crews installed the new culvert on the weekend of Sept. 13-16. The new concrete box culvert is 36 feet long, 12 feet wide, and 8 feet high. It replaced a bridge that had been installed in 1932 and was in poor condition. Periodic single lane closures will continue at Lick Run for paving and other final construction activities. Project completion in early Nov. 2024.

Route 17 (Mills Drive) Overpass Replacement and Widening

Route 17 was widened from two to four lanes from just east of the Hospital Boulevard/Germanna Point Drive intersection to west of a new four-lane I-95 overpass built by this project. Improvements included a shared-use path, sidewalk, crosswalks, and pedestrian crossing signal equipment. New travel lanes are open, but additional construction activity continues. Project completion was originally scheduled for Feb. 2024.

Route 606 (Mudd Tavern Road) Widening

Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be built parallel to Mudd Tavern Road, and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion in May 2025.

Stafford County

Banks Ford Parkway and Celebrate Virginia Parkway Modular Roundabout

Construction to install a modular roundabout is underway at the intersection of Banks Ford Parkway and Celebrate Virgina Parkway. Crews are installing modular roundabout pieces, which are made from recycled material. Signs and pavement markings will guide motorists through the roundabout. Project completion in late Oct. 2024.

Westmoreland County

Route 658 (Monroe Bay Circle)

Monroe Bay Circle is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The bridge is a temporary measure to maintain traffic flow while a bridge replacement project is advanced.

Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This