;

Area road work this week

by | Sep 16, 2024 | Ted Schubel, Transportation

I-95 Northbound and Southbound

Exit 98 (Doswell) to Exit 136 (Centreport Parkway)

Wednesday – Thursday, 9 p.m.-5 a.m. Single lane closures for mobile pothole repair between mile markers 101-136.

Exit 136 (Centreport Parkway) to Exit 140 (Courthouse Road)

Sunday – Monday, 9 p.m.-4:30 a.m. Single lane closures for mobile operation to install pavement markers and rumble strips between mile markers 137-140.

Monday – Thursday, 9 p.m.-4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 137, at the Potomac Creek bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.

Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)

Monday – Thursday, 9 p.m.-4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 145, at the Aquia Creek Bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.

Caroline County

Ladysmith Road

Sunday – Friday, 8 p.m.-6 a.m. Alternating lane closures with flagging operation for pavement marking between Partlow Road and Bridlewood Lane.

Monday – Friday, 9 a.m.-7 p.m. Alternating lane closures with flagging operation for pavement marking between Partlow Road and Bridlewood Lane.

Essex County

Route 17 Northbound

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation near the intersection with Route 637.

Gloucester County

Bridge Cleaning

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures at the following locations for bridge cleaning:

Route 3 over Cow Creek

Route 17 over Fox Mill Run

Route 198 over Harpers Creek

Route 602 over Burkes Pond

Route 614 over Carters Creek

Route 616 over Beaverdam Swamp

Route 641 over Northwest Branch

Secondary Road Resurfacing: Quail Hollow and Founders Mill

Monday – Friday, 7 a.m.-5 p.m. Alternating lane closures in the Quail Hollow and Founders Mill subdivisions for resurfacing. Crews will be applying slurry seal, part of a cape seal resurfacing project.

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Route 17 (Main Street)

Route 3/14

Route 14

Route 198 (Dutton Road)

Route 604

Route 605 (Crab Thicket Road)

Route 605 (Indian Road)

Route 606 (Farys Mill Road)

Route 607 (Fletcher Road)

Route 614 (Hickory Fork Road)

Route 614 (Short Lane)

Route 632 (Aberdeen Creek Road)

Route 678 (Harcum Road)

Route 727 (Owen Street)

King and Queen County

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Route 14 (The Trail) to Route 631 (Bunker Hill Road)

Route 14 (The Trail) to Route 659 (Mantapike Landing Road)

Route 619 (Owens Mill Road)

Route 623 (Indian Neck Road) to Route 721 (Newtown Road)

Route 631 (Stevensville Road)

Route 631 (Bunker Hill Road)

Route 631 (Smithfield Road)

Route 635 (Bradley Farm Road)

King William County

Route 360 Westbound

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation near the intersection with Mill Road.

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with traffic directed by a flagging crew. Sign work along the following routes:

Acquinton Church Road

Calno Road

Commins Road

Etna Mills Road

Globe Road

Hanover Quarter Road to Calno Road

Mt. Pleasant Road to Pampatike Road

Route 30 (King William Road) to Epworth Road

Upshaw Road

Upshaw Road to Newman Drive

Walkerton Road

W. River Road

Woodbury Road to White Marsh Lane

Lancaster County

Route 200 (Irvington Road)

Thursday – Friday, 8 p.m.-5 a.m. Alternating lane closures with traffic directed by a flagging crew for pavement marking and the addition of fresh shoulder stone between Bluff Point Road and the Northumberland County line.

Route 1036

Wednesday – Friday, 8 p.m.-5 a.m. Alternating lane closures with traffic directed by a flagging crew for pavement marking and the addition of fresh shoulder stone between Route 3 and Irvington Road.

Mathews County

Bridge Cleaning

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures at the following locations for bridge cleaning:

Route 223 over Milford Haven at Gwynn’s Island

Route 609 over Garden Creek Canal

Middlesex County

Bridge Cleaning

Monday – Friday, 9 a.m.-3:30 p.m. Alternating lane closures at the following locations for bridge cleaning:

 

Route 629 over My Lady’s Swamp

Spotsylvania County

Route 1 Northbound and Southbound

Monday – Friday, 7 p.m.-7 a.m. Single lane closures between the I-95 southbound off-ramp and I-95 northbound on-ramp and Southpoint Parkway. Traffic signal work.

Route 1 Southbound

Monday – Friday, 9 a.m.-3 p.m. Route 1 southbound right turn lane closure between Route 17 and Spotsylvania Parkway. Permit work. Construction of right turn lane.

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Commonwealth Drive and Palmers Creek Way. Utility work.

Route 3 Eastbound and Westbound

9 p.m. Friday, Sept. 13 – noon Monday, Sept. 16. Route 3 westbound will be closed at Lick Run in the Chancellorsville area between the Spotsylvania County Museum and Spotsylvania Fire Station #5. Westbound traffic will be shifted to travel in the Route 3 eastbound lanes, with one lane of travel open in each direction. Closing Route 3 westbound will allow crews to rapidly install the new concrete culvert box at Lick Run in one extended operation.

Route 3 Eastbound and Westbound

Monday – Friday, 6 a.m.-2 p.m. Single lane closures between Spotswood Furnace Road and Corter Avenue for permit work. On Monday, Sept. 16, these lane closures will be delayed to start after the Route 3 westbound lanes have reopened in the Lick Run culvert installation work zone in the Chancellorsville area.

Monday – Friday, noon-5:30 a.m. Eastbound and westbound single lane closures near Lick Run, between the Spotsylvania County Museum and Montpelier Drive and Glade Drive. Reconstruction work on crossovers.

Route 208 (Courthouse Road)

Monday – Thursday, 9 p.m.-5 a.m. Single lane closure for guardrail installation near the Crown Grant Drive intersection.

Benchmark Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation near the Route 17 intersection.

Block House Road

Monday – Thursday, 9 a.m.-7 p.m. Flaggers will direct alternating one-way traffic between Route 208 and Partlow Road. Pavement marking.

Hall Industrial Drive

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation near the Massaponax Church Road intersection.

Harrison Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure between Kingswood Boulevard and Leavells Road with one-way, alternating traffic. Installation of water main under permit.

Hospital Boulevard

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between the roundabout and Route 17 (Mills Drive). Pavement marking.

Massaponax Church Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure with one-way, alternating traffic between Route 17 and Cedar Forest Drive. Permit work.

Smith Station Road

Sunday – Tuesday, 8 p.m.-6 a.m. Single lane closure on Smith Station Road between Leavells Road and Courthouse Road, with traffic directed by a flagging crew. Pavement marking.

Sunday – Friday, 8 p.m.-6 a.m. Single lane closure on Smith Station Road between Massaponax Church Road and Spotsylvania Parkway for permit work. Utility installation.

Southpoint Parkway

Monday – Thursday, 9 a.m.-3:30 p.m. Single lane closure between Pacific Drive and Route 1.

Spotsylvania Parkway

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures between Hospital Boulevard and Route 1. Pavement marking.

Towles Mill Road

Monday – Friday, 9 a.m.-3 p.m. Single lane closure for guardrail installation near the Route 208 intersection.

Traffic Signal Structure Inspections: Multiple Locations

Monday – Friday, 7 p.m.-6 a.m. Alternating lane closures along the following routes for routine inspections of traffic signal structures:

Gordon Road

Harrison Road

Leavells Road

Salem Church Road

Stafford County

Route 1 Northbound and Southbound

Sunday – Thursday, 8 p.m.-5 a.m. Alternating lane closures for pavement marking between the Potomac Creek bridge and Hospital Center Boulevard.

Monday – Tuesday, 10 p.m.-5 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at Telegraph Road.

Monday – Friday, 9 a.m.- 2:15 p.m. Single lane closures for permit work between Centreport Parkway and Potomac Creek Drive. Curb and gutter repairs.

Monday – Friday, 9 a.m.- 3 p.m. Single lane closures for permit work between South Campus Boulevard and Potomac Creek Drive. Fiber installation.

Tuesday – Wednesday, 8 p.m.-7 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at St. Micheal Street, approximately a half-mile south of Centreport Parkway.

Tuesday – Wednesday, 10 p.m.- 7 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at intersection of I-95 northbound on-ramp and Route 1 at exit 143 (Aquia/Garrisonville)

Route 1 Northbound

Monday – Friday, 9 a.m.- 3 p.m. Single lane closure between Forbes Street and Manning Drive. Permit work. Utility installation.

Monday – Thursday, 9 p.m.- 5 a.m. Single lane closure for guardrail installation near the Potomac Creek bridge, and intersections with Hope Road and Cranes Corner Road.

Route 17 Southbound

Sunday – Friday, 8 p.m.-6 a.m. Alternating lane closures for pavement marking between the Stafford/Fauquier County line and Marsh Road.

Monday – Thursday, 9 a.m.-3 p.m. Alternating northbound and southbound single lane closures between Hartwood Church Road and Clark Patton Road. Permit work. Crews will be clearing trees for utility line installation.

Route 610 at Mine Road

Wednesday – Friday, 9 p.m.-5 a.m. Alternating lane closures and traffic control from Virginia State Police. Routine inspection of traffic signal structure at Mine Road intersection.

Route 610 Westbound

Sunday – Monday, 9 p.m.-7 a.m. Varying single and double westbound lane closures for bridge joint repair at the I-95 overpass. Double lane closures permitted 10 p.m. to 5 a.m.

Berea Church Road CLOSURE

Berea Church Road is closed from Berea Knolls Drive to Theresa Garden Place, and northbound access is closed from Route 17 to Berea Knolls Drive. Construction for a Stafford County project to improve Berea Church Road. View the project page.

Courthouse Road

Monday – Friday, 9 a.m.-7 p.m. Alternating lane closures for pavement marking between Route 1 and Aquia Creek Road.

Monday – Thursday, 9 p.m.-5 a.m. Single lane closure for guardrail installation near the I-95 interchange.

Northhampton Boulevard

Monday – Friday, 9 a.m.-7 p.m. One-way, alternating traffic directed by a flagging crew between Mine Road and Eustace Road. Pavement marking.

Sign Work

Monday – Friday, 9 a.m.-4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:

Hartwood Road to Cropp Road

Heflin Road to Beaver Lodge Road

Kellogg Mill Road

Kellogg Mill Road to Truslow Road

Mt. Olive Road to Poplar Road

Poplar Road to Berea Church Road

Poplar Road to Hartwood Road

Shackelford Well Road

Spotted Tavern Road

Tacketts Mill Road

Truslow Road

 

Washington Street

Monday – Friday, 9 a.m.-3 p.m. Single lane closure near the Route 17 Business intersection. Guardrail installation.

Westmoreland County

Secondary Road Resurfacing

Monday – Friday, 7 a.m.-7 p.m. Alternating lane closures with traffic directed by a flagging crew for road resurfacing applying surface treatment along the following routes:

Route 1332

Route 1333

Route 1345

Route 1347

Route 1354

Route 1365

Additional Projects in Fredericksburg District

Caroline County

Route 638 (South River Road) Bridge Replacement

Construction is underway to replace the Route 638 (South River Road) bridge over South River. A portion of South River Road is closed with a detour in place. The project will be complete by Sept. 2025.

Gloucester County and Mathews County

Route 3/14 Westbound Bridge Rehabilitation

A major bridge rehabilitation project is underway on the Route 3/Route 14 westbound bridge over Burke Mill Stream, which is located at the Mathews and Gloucester line. Crews are improving the 76-year-old structure by replacing the bridge deck, beams, bridge railings, and guardrails. In early-to-mid October 2024, the westbound Route 3/14 travel lanes will close at Windsor Road and eastbound and westbound Route 3/14 traffic will both cross the eastbound bridge over Burke Mill Stream, with one lane open in each direction. Left turns from Windsor Road to Route 14 eastbound are prohibited. Project completion in Nov. 2025.

King and Queen County

Route 621 (Bruington Road) over Dickeys Swamp

Bruington Road is closed to through traffic at the bridge over Dickeys Swamp, with a posted detour along Route 14 and Route 360. This is one of multiple bridges undergoing repair as part of the $3.1 million bridge maintenance project in the Northern Neck and Middle Peninsula to address structure scour. Scour is the erosion of soil around a bridge’s foundation. Weather permitting, the road will reopen in mid-Dec. 2024.

King and Queen County and King William County

Route 628 (Dorrell Road/Spring Cottage Road) Bridge Closure

Dorrell Road/Spring Cottage Road is closed at the bridge over the Mattaponi River, located at the King and Queen and King William county line. A detour route is posted. Construction is underway on a major bridge rehabilitation project. The road will remain closed until early June 2025. The bridge closed for motorist safety in March 2023 after a routine inspection found significant deterioration in key bridge elements.

Spotsylvania County

I-95 Southbound Exit 126 Off-Ramp and Route 1 Southbound

A second right turn lane is under construction from the I-95 southbound off-ramp at exit 126 onto Route 1 southbound. Route 1 southbound is being widened from the off-ramp to Southpoint Parkway with an additional turn lane. A second right turn lane is being added from Route 1 southbound to Southpoint Parkway. Traffic islands will be installed along Southpoint Parkway as a safety improvement to allow left turns into driveways but restrict through and left-turning traffic exiting from side streets. Project completion in Aug. 2025.

Route 3 Westbound Culvert Installation at Lick Run

The existing Route 3 westbound bridge over Lick Run is being replaced with a 36-foot-long, 12-foot-wide, and 8-foot-high concrete box culvert. Route 3 westbound traffic will be shifted temporarily to travel in the Route 3 eastbound lanes from 9 p.m. Friday, Sept. 13-noon Monday, Sept. 16, 2024, and one lane of Route 3 will remain open in each direction during this weekend culvert installation. Project completion in early Nov. 2024.

Route 17 (Mills Drive) Overpass Replacement and Widening

Route 17 was widened from two to four lanes from just east of the Hospital Boulevard/Germanna Point Drive intersection to west of a new four-lane I-95 overpass built by this project. Improvements included a shared-use path, sidewalk, crosswalks, and pedestrian crossing signal equipment. New travel lanes are open, but additional construction activity continues. Project completion was originally scheduled for Feb. 2024.

Route 606 (Mudd Tavern Road) Widening

Mudd Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be built parallel to Mudd Tavern Road, and will connect with South Roxbury Mill Road and Dan Bell Lane. Project completion in May 2025.

Stafford County

Banks Ford Parkway and Celebrate Virginia Parkway Modular Roundabout

Construction to install a modular roundabout is underway at the intersection of Banks Ford Parkway and Celebrate Virgina Parkway. Crews are installing modular roundabout pieces, which are made from recycled material. Signs and pavement markings will guide motorists through the roundabout. Project completion in late Oct. 2024.

Westmoreland County

Route 658 (Monroe Bay Circle)

Monroe Bay Circle is reduced to a single travel lane with a temporary bridge spanning Monroe Creek. A temporary traffic signal is directing one-way, alternating traffic. The bridge is a temporary measure to maintain traffic flow while a bridge replacement project is advanced.

Commuting and Ridesharing Information

 

GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area, part of the George Washington Regional Commission.

 

Let GWRideConnect help you discover your commuting options, such as carpools, vanpools, and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

Share This