I-95 Northbound
Exit 126 (Spotsylvania) to Exit 130 (Route 3)
Wednesday – Thursday, 9 p.m. – 5 a.m. Bridge inspection at mile markers 128-129 at Harrison Road interstate overpass. Mobile lane closures.
Exit 136 (Centreport Parkway) to Exit 140 (Courthouse Road)
Sunday – Thursday, 9 p.m. – 4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 137, at the Potomac Creek bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.
Exit 136 (Centreport Parkway) to Exit 140 (Courthouse Road)
Sunday – Thursday, 9 p.m. – 4:30 a.m. Varying single and double lane closures for milling and paving at mile markers 137-140. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.
Exit 140 (Courthouse Road) Off-Ramp Closure
Monday – Tuesday, 10 p.m. – 4:30 a.m. Off-ramp closed overnight for milling and paving. Drivers should use exit 136 (Centreport Parkway) or exit 143 (Aquia/Garrisonville) as an alternate interchange, depending on their destination. Message boards will be posted during ramp closure. If the work cannot be completed Monday night into Tuesday morning, it will be rescheduled to occur Tuesday evening into Wednesday morning.
Exit 143 (Aquia/Garrisonville) to Exit 148 (Quantico)
Sunday – Thursday, 9 p.m. – 4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 145, at the Aquia Creek Bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.
I-95 Southbound
Exit 148 (Quantico) to Exit 143 (Aquia/Garrisonville)
Sunday – Thursday, 9 p.m. – 4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 145, at the Aquia Creek Bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.
Exit 140 (Courthouse Road) to Exit 136 (Centreport Parkway)
Sunday – Thursday, 9 p.m. – 4:30 a.m. Varying single and double lane closures for bridge maintenance at mile marker 137, at the Potomac Creek bridge. Single lane closure begins at 9 p.m. followed by a double lane closure starting at 10 p.m.
Exit 130 (Route 3) to Exit 126 (Spotsylvania)
Wednesday – Thursday, 9 p.m. – 5 a.m. Bridge inspection at mile markers 129-128 at Harrison Road interstate overpass. Mobile lane closures.
Exit 110 (Ladysmith) to Exit 104 (Carmel Church)
Monday – Thursday, 6 p.m. – 7 a.m., Friday, 9 p.m. –7 a.m., Saturday, 7 p.m. – 7 a.m. and Sunday, 8 p.m. – 7 a.m. Single lane closure for shoulder restoration work at mile markers 108-107.
City of Fredericksburg
Route 3 Westbound
Sunday – Thursday, 8 p.m. – 5 a.m. Alternating lane closure with flagging operation for pavement marking on Route 3 westbound between Woodlyn Drive and Gateway Boulevard.
Caroline County
Ladysmith Road
Monday – Friday, 8:30 a.m. – 7 p.m. Alternating lane closures with flagging operation for milling and paving between Partlow Road and Bridlewood Lane.
Bridge Cleaning
Monday – Friday, 9 a.m. – 3:30 p.m. Bridge cleaning at multiple locations across Caroline County. Expect lane closures and alternating one-way traffic at times directed by a flagging crew. Crews will be working at the following bridges:
- Route 207 over CSX Railroad tracks
- Route 207 over Mattaponi River
- Route 301 over Mattaponi River
- Route 600 over Boot Swamp
- Route 626 over Mattaponi River
- Route 638 over South River
- Route 644 over Maracossic Creek
- Route 647 over Mattaponi River
- Route 654 over Mattaponi River
- Route 722 over Mattaponi River
- Route 722 over CSX Railroad tracks
Gloucester County
Sign Work
Monday – Friday, 9 a.m. – 4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:
- Route 17 (Main Street)
- Route 3/14
- Route 14
- Route 198 (Dutton Road)
- Route 605 (Crab Thicket Road)
- Route 605 (Indian Road)
- Route 614 (Hickory Fork Road)
- Route 632 (Aberdeen Creek Road)
King George County
Route 218 (Caledon Road)
Monday – Friday, 8 a.m. – 7 p.m. Alternating, one-way traffic on Route 218 near Vertical Ridge Drive for installation of high-friction surface treatment. Flaggers will direct drivers through the work zone.
Secondary Road Resurfacing
Monday – Friday, 7 a.m. – 5 p.m. Alternating lane closures. Flaggers will direct drivers through the work zone. Road resurfacing to apply cape seal treatment on the following secondary routes:
- 10th Street
- 11th Street
- 12th Street
- 14th Street
- 15th Street
- Austin Drive
- Combs Drive
- Duclos Lane
- Ferry Dock Road
- Forrest Road
- Gordon Drive
- Haven Court
- Leeward Drive
- Payne Drive
- Norton Drive
- N. Williams Creek Drive
- Potomac Drive
- Rosedale Drive
- Schooner Circle
- Townsend Drive
- Quesenbeery Drive
- Windward Drive
King and Queen County
Sign Work
Monday – Friday, 9 a.m. – 4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:
- Route 619 (Owens Mill Road)
- Route 631 (Stevenville Road)
- Route 631 (Bunker Hill Road)
- Route 635 (Bradley Farm Road)
King William County
Route 604 over Herring Creek
Monday – Friday, 9 a.m. – 3:30 p.m. One-way, alternating traffic. Bridge cleaning.
Secondary Road Resurfacing
Monday – Friday, 7 a.m. – 7 p.m. One-way, alternating traffic directed by a flagging crew. Road resurfacing to apply surface treatment on the following routes:
- Commins Road
- Dabneys Mill Road
- Hazelwood Road
- Herring Circle
Sign Work
Monday – Friday, 9 a.m. – 4 p.m. Alternating mobile lane closures with traffic directed by a flagging crew. Sign work along the following routes:
- Acquinton Church Road
- Calno Road
- Etna Mills Road
- Globe Road
- Upshaw Road
- Walkerton Road
- W. River Road
Lancaster County
Route 3
Monday – Thursday, 8 p.m. – 5 a.m. Alternating lane closures with traffic directed by a flagging crew. Milling and paving operations between Methodist Church Road and Blueberry Point Road.
Route 200 (Chesapeake Drive)
Thursday – Friday, 8 p.m. – 5 a.m. Alternating lane closures with traffic directed by a flagging crew. Milling between Rappahannock Drive and Sandlin Drive.
Harris Road
Sunday – Wednesday, 8 p.m. – 5 a.m. Alternating lane closures with traffic directed by a flagging crew. Paving operations between Mary Ball Road and Irvington Road.
Spotsylvania County
Route 1 over Matta River
Monday – Friday, 9 a.m. – 3:30 p.m. Lane closures approximately one mile north of the Caroline County line at bridge over Matta River. Bridge cleaning.
Route 1 Southbound
Monday – Friday, 9 a.m. – 3 p.m. Route 1 southbound right turn lane closure between Route 17 and Spotsylvania Parkway for permit work.
Route 3 Eastbound
Monday – Friday, Noon – 5:30 a.m. Single lane closures between Montpelier Drive and the Spotsylvania County museum. Lick Run culvert installation project.
Route 3 Westbound
Monday – Friday, 6 a.m. – 2 p.m. Single lane closure between Spotswood Furnace Road and Corter Avenue for permit work.
Monday – Friday, Noon – 5:30 a.m. Single lane closures between the Spotsylvania County museum and Montpelier Drive. Lick Run culvert installation project.
Route 17 (Mills Drive)
Monday – Friday, 9 a.m. – 3 p.m. Alternating lane closures between Route 1 and the Old Dominion Parkway intersection. Traffic signal equipment work and pavement marking.
Antler Road
Wednesday – Friday, 9 a.m. – 4 p.m. Flagging on Antler Road near Antler Court and Fishing Run Creek to allow crews to take soil samples for possible future work.
Block House Road
Monday – Friday, 8:30 a.m. – 7 p.m. Flaggers will direct alternating one-way traffic between Route 208 Business and Partlow Road for milling and paving.
Brock Road
Monday – Friday, 8:30 a.m. – 7 p.m. Alternating lane closures directed by a flagging crew for pavement marking work between Talley Road and Gordon Road.
Dell Way
Wednesday – Friday, 9 a.m. – 4 p.m. Flagging on Dell Way near Glade Drive to allow crews to take soil samples for possible future work.
Harrison Road
Monday – Friday, 9 a.m. – 3 p.m. Single lane closure between Kingswood Boulevard and Leavells Road with one-way, alternating traffic. Installation of water main under permit.
Massaponax Church Road
Monday – Friday, 9 a.m. – 3 p.m. Single lane closure with one-way, alternating traffic between Route 17 and Cedar Forest Drive for permit work.
Monday – Friday, 8:30 a.m. – 7 p.m. Flaggers will direct alternating one-way traffic between Hickory Ridge Road and the Route 208 Business intersection for milling and paving.
Morris Road
Sunday – Wednesday, 8 p.m. – 6 a.m. Flaggers will direct alternating one-way traffic between Route 1 and Partlow Road for pavement marking work.
Mudd Tavern Road
Monday, 9 a.m. – 6 p.m. Mobile lane closures with flagging crew directing traffic. Placement of shoulder stone between Dominion Raceway Avenue and the Spotsylvania and Caroline county line.
Smith Station Road
Sunday – Friday, 8 p.m. – 6 a.m. Single lane closure on Smith Station Road between Massaponax Church Road and Spotsylvania Parkway with one-way, alternating traffic for utility/permit work.
Southpoint Parkway
Monday – Thursday, 9 a.m. – 3:30 p.m. Single lane closure between Route 1 and Pacific Drive for bridge work.
Sign Work
Monday – Friday, 9 a.m. – 4 p.m. Mobile lane closures with flagging operations for sign work on the following routes:
- Brock Road
- Courthouse Road
- Marye Road
- Orange Plank Road
- River Road
Stafford County
Route 1
Tuesday – Friday, 9 a.m. – 3 p.m. Left lane closures on Route 1 between Enon Road and Potomac Creek Drive for permit work.
Banks Ford Road and Celebrate Virginia Parkway
A four-way stop is installed at the Banks Ford Parkway and Celebrate Virginia Parkway intersection. Watch for construction activity underway to install a modular roundabout. Read a news release on the project here.
Berea Church Road CLOSURE
Berea Church Road is closed from Berea Knolls Drive to Theresa Garden Place, and northbound access is closed from Route 17 to Berea Knolls Drive. Construction for a Stafford County project to improve Berea Church Road. View the project page.
Brent Point Road
Tuesday – Friday, 7 a.m. – 5 p.m. One-way, alternating traffic directed by a flagging crew between Arkendale Road and the end of state maintenance. Road resurfacing using cape seal treatment.
Courthouse Road
Sunday – Thursday, 8 p.m. – 6 a.m. Milling and paving east of Route 1, from Route 1 to Aquia Creek Road. Alternating lane closures.
Monday – Friday, 9 a.m. – 3 p.m. East of Route 1, a single lane will be closed on Courthouse Road between Route 1 and Hospital Center Boulevard for construction of a sidewalk under permit.
Decatur Road
Tuesday – Friday, 7 a.m. – 5 p.m. One-way, alternating traffic directed by a flagging crew between Norman Road and Indian View Court. Road resurfacing using cape seal treatment.
Layhill Road/Forbes Street/Morton Road/Primmer House Road
Monday – Friday, 8:30 a.m. – 7 p.m. One-way, alternating traffic directed by a flagging crew along Layhill Road/Forbes Street/Morton Road/Primmer House Road for paving work between Route 1 and the Riggs Road intersection.
Richland Road
Tuesday – Friday, 7 a.m. – 5 p.m. One-way, alternating traffic directed by a flagging crew between Route 17 and Hartwood Road. Road resurfacing using cape seal treatment.
Sign Work
Monday – Friday, 9 a.m. – 4 p.m. Alternating mobile lane closures with flagging operations for sign work on the following routes:
- Poplar Road
- Shackelford Well Road
- Spotted Tavern Road
- Tacketts Mill Road
- Truslow Road
Pavement Marking: Secondary Routes
Thursday – Friday, 7 a.m. – 5 p.m. Mobile lane closures on numerous secondary routes to refresh pavement markings.
Westmoreland County
Secondary Road Resurfacing
Monday – Friday, 7 a.m. – 7 p.m. One-way, alternating traffic directed by a flagging crew to apply surface treatment on the following routes:
- Broadfield Road
- Buckner Creek Road
- Chatham Lane
- Emmas Drive
- Oyster House Road
- Poor Jack Road
- Willlis Place
- Wise Place