I-95 Northbound
Exit 98 (Doswell) to I-95 Northbound Safety Rest Area
Sunday – Wednesday, 9 p.m. – 5 a.m. Mobile operation with single to double lane closures for milling and paving the travel lanes north of Exit 98/Doswell at mile marker 101 to mile marker 108, which is near the I-95 Northbound Safety Rest Area and Welcome Center. Crews will also close the on- and off-ramps at exit 104 (Route 207/Rogers Clark Boulevard). Northbound travelers seeking Route 207 are advised to use exit 110 (Route 639/Ladysmith Road) to I-95 southbound then use the southbound ramps to access Route 207 as the recommended detour. Drivers should use the most convenient alternate route to Route 207 depending on their destination.
Exit 126 (Spotsylvania)
Wednesday – Friday, 10 p.m. – 4:30 a.m. Single northbound lane closure for construction activities related to the Route 17 overpass replacement project.
Exit 136 (Centreport Parkway)
Tuesday, 9 a.m. – Noon. Single northbound lane closure for construction activities for Improve95 projects.
Exit 140 (Courthouse Road)
Monday – Tuesday and Thursday – Friday, 9 p.m. – 4:30 a.m. Single northbound lane closure for construction activities for Improve95 projects.
Exit 148 (Quantico)
Wednesday – Friday, 9 p.m. – 4:30 a.m. and Friday – Saturday, 10 p.m. – 4:30 a.m. Single northbound lane closure for construction activities for Improve95 projects.
I-95 Southbound
Exit 136 (Centreport Parkway) to Exit 133 (Route 17)
Monday – Thursday, 5 a.m. – 10 a.m. Single southbound lane closure for construction activities for Improve95 projects.
Exit 133 (Route 17) to Exit 130 (Route 3)
Monday – Friday, 9 p.m. – 4:30 a.m. and Thursday – Friday, 9 p.m. – 6 a.m. Single southbound lane closure at 9 p.m. followed by double lane closures at 10 p.m. for construction activities for Improve95 projects. Double lane closures will end at 4:30 a.m. A single southbound lane will remain closed until 10 a.m. except on Friday when all lanes will reopen by 6 a.m.
Exit 126 (Spotsylvania) to Exit 118 (Mudd Tavern Road)
Sunday – Thursday, 9 p.m. – 5 a.m. Mobile operation with single to double lane closures for milling and paving the travel lanes south of Exit 126 at mile marker 121 to mile marker 117, which is near the Exit 118 interchange.
Stafford County
Route 1 Northbound
Monday – Friday, 9 a.m. – 3 p.m. Single northbound lane closure for Potomac Creek bridge replacement, between Potomac Creek Lane and Centreport Parkway intersection.
Route 3 Westbound
24-hour-lane closure. Right westbound lane on Route 3 between Route 607 and Route 218 at the bridge over CSX for work under the bridge.
Route 3 Eastbound
Sunday – Thursday, 9 p.m. – 5 a.m. Mobile operation with alternating lane closures on Route 3 eastbound between Muddy Creek Bridge and Cleek Lane for pavement markings.
Hospital Center Boulevard
Monday – Thursday, 9:30 a.m. – 3 p.m. and Friday, 9:30 a.m. – 2 p.m. Single lane closures on Hospital Center Boulevard between Route 1 and Wyche Road for pavement repair.
Spotsylvania County
Route 3 (Plank Road)
Sunday – Friday. 7 p.m. – 6 a.m. Alternating single lane closures on Route 3 between Chewning Drive and Bragg Road for pavement marking work.
Route 17 (Mills Drive)
Sunday – Friday, 7 p.m. – 6 a.m. Alternating single lane closures on Route 17 at the bridge over CSX railroad tracks located between Route 608 and Route 609 for bridge work.
Route 620 (Harrison Road)
Monday – Friday, 9 a.m. – 3 p.m. Single lane closures on Harrison Road with one-way, alternating traffic between the I-95 overpass and Salem Station Boulevard for tree clearing associated with water line placement. Construction for development under permit.
Route 639 (Leavells Road/Salem Church Road)
Sunday – Friday, 7 p.m. – 6 a.m. Milling and paving. Mobile single lane closures for road resurfacing work between Route 3 and Route 208. Motorists can expect a temporary rough surface in milled areas.
Surface Treatment
Monday – Friday, 7 a.m. – 7 p.m. Mobile single lane closures for road resurfacing on the following routes:
- Route 1249 (Campbell Drive)
- Route 2050 (Grayson Lane)
- Route 2051 (Amherst Circle)
- Route 2052 (Essex Court)
- Route 2053 (Amelia Drive)
- Route 2054 (Bedford Court)
- Route 2055 (Lexington Court)
- Route 2056 (Augusta Court)
- Route 2057 (Bristol Court)
- Route 2058 (Norfolk Way)
- Route 2059 (Chris Shan Court)
- Route 2060 (North Hampton Lane)
- Route 2061 (Gloucester Lane)
- Route 2062 (Bath Court)
Caroline County
Route 207
Sunday – Friday, 8 p.m. – 5 a.m. Alternating single lane closure on Route 207 from Route 3 to Route 208 for pavement work. Flaggers will direct drivers through the work zone.
Route 601 (Golansville Road)
Wednesday – Friday, 5 a.m. – 5 p.m. Alternating single lane closure on Route 601 at the bridge over Stevens Mill for repairs. Flaggers will direct drivers through the work zone.
Surface Treatment
Monday – Friday, 7 a.m. – 7 p.m. Drivers should expect alternating single lane closures on the following routes for surface treatment. Flaggers will direct drivers through each work zone.
- Route 603 (Countyline Church Road)
- Route 605 (Paige Road)
- Route 628 (Antioch Road)
- Route 722 (Nelson Hill Road)
Essex County
Route 609 (Essex Mill Road)
Monday – Friday, 8 a.m. – 5 p.m. Drivers should expect delays on Route 609 at the intersection with Route 17 (Tidewater Trail) and Route 615 (Mussel Swamp Road) for the installation and removal of highway signs. Flaggers will direct drivers through the work zone.
Route 611 (Johnville Road)
Monday – Friday, 8 a.m. – 5 p.m. Drivers should expect delays on Route 611 at the intersection with Route 655 (Vineyard Road) for the installation and removal of highway signs. Flaggers will direct drivers through the work zone.
Route 618 (Scotts Mill Road)
Monday – Friday, 8 a.m. – 5 p.m. Drivers should expect delays on Route 618 at the intersection with Route 659 (Desha Road) and Route 627 (Mt. Landing Road) for the installation and removal of highway signs. Flaggers will direct drivers through the work zone.
Route 659 (Desha Road)
Monday – Friday, 8 a.m. – 5 p.m. Drivers should expect delays on Route 659 at the intersection with Route 671 (Church Hill Road) and Route 706 (Industrial Road) for the installation and removal of highway signs. Flaggers will direct drivers through the work zone.
Route 716 (Waring Mill Road)
Monday – Friday, 8 a.m. – 5 p.m. Drivers should expect delays on Route 716 at the intersection with Route 17 (Tidewater Trail) and Route 627 (Mt. Landing Road) for the installation and removal of highway signs. Flaggers will direct drivers through the work zone.
King George County
Route 301 Northbound
Tuesday – Thursday, 9 a.m. – 3 p.m. Single lane closure on Route 301 northbound at the approach to the Nice Bridge for utility relocation as part of Maryland’s new Nice-Middleton Bridge project. A flagging crew will direct drivers in the work zone.
Route 301 Southbound
Sunday – Thursday, 9 p.m. – 5 a.m. Mobile operation with alternating lane closures on Route 301 southbound between Route 3 and Port Conway Road for pavement markings.
Route 605 (Bloomsbury Road)
Monday – Thursday, 7 a.m. – 7 p.m. Alternating one-way traffic on Paige Road between Route 3 and Route 218 for paving. Flaggers will direct drivers in the work zone.
Route 609 (Comorn Road)
Friday, 7 a.m. – 7 p.m. Alternating one-way traffic on Paige Road between Route 3 and Route 218 for paving. Flaggers will direct drivers in the work zone.
Route 623 (Jersey Road)
Road closure. Jersey Road is closed to through traffic near the Rt. 301 intersection for an emergency pipe replacement project. Road is anticipated to remain closed until Aug. 2021. Detour route is posted along Route 301 and Route 3.
King and Queen County
Bridge Washing Operation
Sunday – Friday, 7 p.m. – 6 a.m. Mobile single lane closures or flagging operations on various routes for bridge washing. Be alert to mobile work zones at the following bridge:
- Route 14 over Heartquake Creek
King William County
Route 296 (Kirby Street, 10th Street)
Monday – Tuesday, 7 a.m. – 7 p.m. Mobile operation for pavement markings between Route 33 (14th Street) and Route 298 (Lee Street).
Route 298 (Lee Street)
Monday – Tuesday, 7 a.m. – 7 p.m. Mobile operation for pavement markings between the end of state maintenance near the railroad tracks and Route 33 (14th Street).
Route 360 Eastbound
Sunday, 7 a.m. – 7 p.m. and 7 p.m. – 7 a.m. (24-hour operation) Drivers should expect alternating single lane closures on Route 360 eastbound from the east end of the Moncuin Creek bridge to the King and Queen County line for milling and paving.
Route 613 (Dunlace Road)
Wednesday – Friday, 7 a.m. – 7 p.m. Alternating single lane closures with a flagging crew alternating one-way traffic between Route 682 (Tidy Cat Road) and Route 30 for pavement markings and to place stone along the shoulder.
Route 618 (Acquinton Church Road)
Monday – Thursday, 7 a.m. – 7 p.m. Mobile single lane closures with a flagging crew alternating one-way traffic between Route 600 (E. River Road) and Route 629 (Jack’s Creek Road) while crews continue paving and place stone along the shoulder.
Route 625 (Custis Millpond Road)
Tuesday – Friday, 7 a.m. – 7 p.m. Alternating single lane closure with a flagging crew directing drivers through the work zone on Route 625 between Route 30 and Route 640 for pavement markings.
Route 1129 (Main Street)
Monday – Wednesday, 7 a.m. – 7 p.m. Mobile operation for pavement markings between Route 1121 (1st Street) and Route 30/33 (14th Street).
Lancaster County
Bridge Washing Operation
Sunday – Friday, 7 p.m. – 6 a.m. Mobile single lane closures or flagging operations on various routes for bridge washing. Be alert to mobile work zones at the following bridges:
- Route 3 over Corrotoman River
- Route 3 over Bellwood Run
- Route 200 over Carters Creek
- Route 354 over Ball Mill Pond
Mathews County
Route 608 (Hamburg Road/Potato Neck Road)
Tuesday, 7 a.m. – 7 p.m. A flagging crew will alternate, one-way traffic on Route 608 between Route 14 and Bethel Beach Road for paving, pavement marking and the placement of shoulder stone.
Surface Treatment
Monday – Friday, 7 a.m. – 7 p.m. Mobile single lane closures as crews apply surface treatment on the following routes:
- Route 624 (Store Road)
- Route 629 (Ebenezer Church Road)
- Route 642 (Fitchetts Wharf Road)
- Route 658 (Kingston Lane)
- Route 723 (Piankatank Way)
- Route 729 (Weston Hall)
Northumberland County
Surface Treatment
Monday – Friday, 7 a.m. – 5 p.m. Mobile single lane closures as crews apply surface treatment on the following routes:
- Route 761 (Lee Dale Drive)
- Route 1400 (Alabama Drive)
- Route 1401 (Bay Quarter Drive)
- Route 1403 (Presley Creek Drive)
- Route 1404 (Colorado Drive)
- Route 1405
Bridge Washing Operation
Sunday – Friday, 7 p.m. – 6 a.m. Mobile single lane closures or flagging operations on various routes for bridge washing. Be alert to mobile work zones at the following bridges:
- Route 200 over Great Wicomico River
- Route 202 over Hampton Hall Creek
- Route 360 over Coan River
Richmond County and Town of Tappahannock
Route 360 over the Rappahannock River: Downing Bridge
Sunday – Monday, 9 p.m. – 6 a.m. One-way, alternating traffic on Route 360 on the Downing Bridge over the Rappahannock River between Richmond County and the Town of Tappahannock. Bridge maintenance to repair bridge deck, bridge joints. Traffic will be directed by automated flagging assistance devices.
Richmond County
Route 3 (Historyland Highway)
Wednesday – Friday, 5 a.m. – 5 p.m. One-way, alternating traffic on Route 3 at the bridge over Chinn’s Mill Pond, which is near the Lancaster County line, for bridge repairs. Flaggers will direct drivers in the work zone.
Bridge Washing Operation
Sunday – Friday, 7 p.m. – 6 a.m. Mobile single lane closures or flagging operations on various routes for bridge washing. Be alert to mobile work zones at the following bridges:
- Route 3 over Totuskey Creek
Westmoreland County
Route 631 (Longfield Road)
Monday – Friday, 8 p.m. – 5 p.m. Drivers should expect delays on Route 631 between Route 628 (PoMona Road) and Route 205 (Ridge Road) for the installation and removal of highway signs. Flaggers will direct drivers through the work zone.
Bridge Washing Operation
Sunday – Friday, 7 p.m. – 6 a.m. Mobile single lane closures or flagging operations on various routes for bridge washing. Be alert to mobile work zones at the following bridge:
- Route 3 over Chandlers Mill Pond
Additional Construction Projects in
Fredericksburg District
Caroline County
Route 17 Emergency Repair
An emergency repair project is underway on Route 17 (Tidewater Trail) in Caroline County between Mount Road and Ware Creek Road to stabilize an adjacent slope and drainage pipe underneath the road. Route 17 is open to traffic, but motorists can expect one-way, alternating traffic controlled by a temporary traffic signal, or intermittent direction by a flagging crew. There is no vehicle height or width restriction in the work zone, and vehicles of all legal loads may pass through this area. Repairs are anticipated to be complete in June 2021.
Route 207 Southbound Bridge Replacement
Route 207 is reduced to a single northbound and southbound lane at the bridge over the Mattaponi River. Traffic is traveling in the northbound lanes while the southbound bridge is closed for a replacement project. The new southbound bridge is anticipated to open to traffic in Sept. 2021.
Route 743 (Clifton Road) over South River
Construction began in December 2020 to replace a structurally deficient timber bridge on Clifton Road over the South River. The existing bridge is open during construction. The new bridge will be a concrete structure, and will allow heavier vehicles to cross. The new bridge is scheduled to open in Oct. 2021.
City of Fredericksburg
Route 3 Business at Chatham Bridge
The Chatham Bridge is closed to traffic for an improvement project. Drivers should follow the posted detour signs directing traffic around the bridge closure. The bridge will reopen to traffic in Oct. 2021, and all construction work will be complete by April 2022.
Essex County
Route 17 Corridor Improvements
Construction has begun on spot improvements to improve bicyclist and pedestrian travel and enhance traffic flow along Route 17 in the Tappahannock area. Most lane closures will be scheduled during overnight hours due to heavy traffic volumes near the Rt. 17 and Rt. 360 intersection. Project completion is June 2021.
Gloucester County
Pedestrian Improvements at Route 17 and Route 17 Business (Main Street)
Construction is substantially complete on a project to build sidewalk, crosswalks, pedestrian refuge islands, and new pedestrian crossing equipment at the northern intersection of Route 17 and Route 17 Business, and at Route 17 and McFadden Way. Pedestrian crossing signal equipment scheduled to be installed in summer 2021.
Gloucester County and King and Queen County
Route 14 Bridge Replacement over Poropotank Creek
Route 14 is closed to through traffic at Poropotank Creek for a bridge replacement project. The bridge is located at the Gloucester County and King and Queen County line. Traffic is detoured to use Route 17 and Route 33 during the project. The road is scheduled to reopen in July 2021.
Gloucester County and Middlesex County
Route 17 Southbound over Dragon Run
Route 17 southbound is reduced to a single lane for a bridge rehabilitation project over Dragon Run. The bridge is located at the county line between Gloucester County and Middlesex County. Project estimated completion is Aug. 2021.
Middlesex County
Route 625 (Barrick’s Mill Road) Bridge Replacement
A portion of Barrick’s Mill Road is closed to traffic at Mill Creek for approximately 14 weeks while crews replace the existing bridge over Barrick’s Mill Creek. Drivers on Barrick’s Mill Road will be detoured around the 24-hour road closure using the following routes:
Route 625 (Barrick’s Pond Road)
Route 626 (Wake Road)
Route 624 (Regent Road)
King George County
Route 623 (Jersey Road)
Jersey Road is closed to through traffic near the Rt. 301 intersection for an emergency pipe replacement project. Road is anticipated to remain closed until Aug. 2021. Detour route is posted along Route 301 and Route 3.
King William County
Route 662 (Sharon Road)
A portion of Sharon Road is closed for reconstruction following damage from Tropical Storm Michael. A project to reconstruct a slope and replace a culvert is anticipated to begin in spring 2021, and will reopen to traffic in summer 2021.
Stafford County
Route 1 at Potomac Creek
Construction is underway to replace the Route 1 bridge over Potomac Creek in Stafford County. Route 1 will continue to have four travel lanes open during the project, with only periodic single lane closures required. The new bridge will be complete in July 2022.
Spotsylvania County
Route 17 Overpass Replacement and Widening
Construction started in December 2020 on a project to replace the existing two-lane interstate overpass on Route 17 with a four-lane bridge. Route 17 will be widened to four travel lanes to just east of the Hospital Boulevard/Germanna Point Drive intersection. Sidewalk, a shared-use path, and pedestrian crossing equipment will be added as part of the project. Improvements will be completed in Feb. 2024.
Town of West Point and New Kent County
Route 30/33 (Eltham Bridge)
Eastbound single lane closure on Eltham Bridge, with work zone barrier. Single lane closure is in place through June 2021. Crews are identifying locations where a future project will repair grout on the bridge.
Westmoreland County
Route 3 Passing Lanes
Construction began Jan. 4 on a project to build eastbound and westbound passing lanes over a 1.5-mile segment of Route 3. When work is complete, Route 3 will become a four-lane undivided road from north of Route 639 (Winter Harbor Road) to east of Route 624 (Longwood Road), with new turn lanes at key intersections. The project will be complete in late Dec. 2021.